5
1. Remove all packaging material. This includes the foam base and all
adhesive tape holding the freezer accessories inside and
outside.
2. Inspect and remove any remains of packing, tape or printed
materials before powering on the freezer.
Your freezer is designed for freestanding installation only.
It should not be recessed or built-in.
Place the freezer on a floor strong enough to support it fully loaded.
When moving the freezer, never tilt it more than a 45-degree angle.
This could damage the compressor and the sealed system.
If the freezer is tilted let it stand in an upright position for at least 24
hours prior to plugging. This is to allow the refrigerant to settle.
To assure your freezer works at the maximum efficiency it
was designed for, you should install it in a location where there
is proper air circulation, plumbing and electrical connections.
Thefollowing are recommended clearances around the refrigerator:
Sides................. 4" (102mm)
Top....................4" (102mm)
Back..................4" (102mm)
Proper Air Circulation
Adjusting Your Freezer
Unpacking Your Freezer
Installing Your Freezer
5
Summary of Contents for BD-120H
Page 2: ......