HAGOR Homefix I Installation Manual Download Page 7

HAGOR Products GmbH | Oberbecksener Straße 97 | D-32547 Bad Oeynhausen | Telefon: +49(0)57 31-7 55 07-0 | Mail: [email protected]

Set length of stroke

Please note that the minimum and maximum lifting height is preset and there may be severe  

damage to the lift, mounting frame, beamer etc.

 

• 

Connect the beamer lift to the mains connection

 

 

•  

Set the desired end positions of the lifting height  

 

 

on the adjusting screws directly on the motor

 

 

•  

The lift is factory set so that it retracts to the maximum. A space of  

 

 

5 cm remains between the base plate and the ceiling.

 

 

•  

The end stop is now set so that there is also space for beamers with a  

 

 

greater height. Adjust the upper end stop so that the beamer has enough  

 

 

space between the base plate and the ceiling.

 

 

•  

Now set the desired maximum exit height.

 

 

 

•  

Adjust the length of the cable drag chain to the lifting height.  

 

 

Make sure that the kink area does not run beyond the device storage space. If  

 

 

necessary lay them in the offset (2 kink areas). It is also possible to move the 

 

 

 

upper fastening point of the cable routing (direct ceiling fastening) in order to move  

 

 

the kink area of   the cable duct over the installation area.

 

 

•  

Move the lift to the top position and check the minimum installation height when  

 

 

retracted. Compare this with the height of the beamer to be installed to rule out    

 

 

that it can be pinched when driving in.

 

 

•  

Also observe the assembly instructions of the projector manufacturer regarding    

 

 

installation dimensions in closed housings to ensure operation and ventilation.

 

 

•  

Test the space in a trial operation before installing the beamer on the base  

 

 

plate and check for quiet and smooth operation. Make sure that the lift runs freely.

 

 

•  

If necessary, use a pedestal or a ladder to ensure that the lower plate is easily

 

 

accessible to you. A platform is preferable to a ladder. Make sure that the platform  

 

 

or the ladder is secure! 

A = final position CLOSE 

 

 (

+

) closer 

 (

-

less close 

B = final position OPEN 

 

 (

+

) open 

 (

-

less open 

Summary of Contents for Homefix I

Page 1: ...n Telefon 49 0 57 31 7 55 07 0 Mail hagor hagor de Installation guide Homefix I Item no 2199 DE Installationsanleitung ES Gu a de instalaci n GB Installation manual FR Guide d installation SE Installa...

Page 2: ...setzen Sie diese bei Bedarf durch geeignete Materialien Falls Sie Bez glich der Installation des Produkts unsicher sind oder noch Fra gen haben wenden Sie sich an uns oder anderes ausgebildetes Fachpe...

Page 3: ...ted occurring forces This is a minimum requirement Also make sure that you comply with local regulations 3 Before starting make sure that all necessary fastening materials and tools are at hand Only m...

Page 4: ...e 15 Nm rated speed 15 UPM load max 25 kg standards DIN EN 13561 DIN EN 13659 DIN EN 14202 Safety instructions Risk of electric shock Before you start wiring work make sure that the lines are voltage...

Page 5: ...ket wrenches Set of ring spanners Set of allen keys Adjustable wrench Bubble level Ladder scaffolding or liftung platform Drills and bits Screwdriver Helper installation with two people is recommended...

Page 6: ...r and the screen and the installation instructions from the beamer manufacturer Observe the operating instruc tions of all devices Disconnect the lift from the power supply before installing it on the...

Page 7: ...ea does not run beyond the device storage space If necessary lay them in the offset 2 kink areas It is also possible to move the upper fastening point of the cable routing direct ceiling fastening in...

Page 8: ...the beamers power cable gets into the mechanics of the lift this can damage the cable insulation and make parts of the lift conductive It is therefore essential to route the cables in the energy suppl...

Page 9: ...and make parts of the lift conductive It is therefore essential to route the cables in the energy supply chain Installation of the beamer under the lift hanging Move the lift to the lowest position Di...

Page 10: ...to the lower position before separating the energy connection Risk of electric shock If the beamers power cable gets into the mechanics of the lift this can damage the cable insulation and make parts...

Page 11: ...out resistance If necessary adjust until the panel fits exactly into the inserts Trial run after installation A trial run must be performed to check the position of the cover to the suspended ceiling...

Page 12: ...r joint mechanism is an incentive for children to play When playing with the lift children could grab the mechanism and shear their fingers The beamer lift must not be operated by children Keep the ra...

Page 13: ...supply If the beamer lift does not lower even though engine noise can be heard when it is actuated this could be due to a blockage in the mechanics When the blockage is released the lift with the ins...

Page 14: ...arrying out any cleaning work disconnect the ceiling bracket from the power supply by pulling the power plug and placing it in sight so that you can monitor it immediately to prevent unauthorized inse...

Page 15: ...plier manufacturer of the media control The receiver replaces the receiver of the handheld transmitter included in the scope of delivery In the Homefix article a tubular motor is used which is also us...

Page 16: ...there are no people next to or below it Only operate the lift when you are in sight When loosening a blockage do not reach into the mechanics of the lift Before loosening a blockage disconnect the li...

Page 17: ...nrichtlinie 2006 42 EG EMV Richtlinie 2004 108 EG Angewandte harmonisierte Normen deren Fundstellen im Amtsblatt der EU ver ffentlicht worden sind EN ISO 12100 03 2011 Sicherheit von Maschinen Allgeme...

Page 18: ...HAGOR Products GmbH Oberbecksener Stra e 97 D 32547 Bad Oeynhausen Telefon 49 0 57 31 7 55 07 0 Mail hagor hagor de...

Page 19: ...HAGOR Products GmbH Oberbecksener Stra e 97 D 32547 Bad Oeynhausen Telefon 49 0 57 31 7 55 07 0 Mail hagor hagor de...

Page 20: ...HAGOR Products GmbH Oberbecksener Stra e 97 D 32547 Bad Oeynhausen Telefon 49 0 57 31 7 55 07 0 Mail hagor hagor de...

Reviews: