PCB Chassis Assembly Installation
8-3
P/N 108755-US, Manual revision: AA
Figure 8-1, Fuse Holder
6.
Apply power to the Shaker, turn on and observe that Shaker display shows
VER HB01,BB V.92, then <READY>.
7.
Press <*> to cycle shroud assembly and count the cycles for one minute
(cpm). If power supply p/n 10403200 is installed, adjust potentiometer
RV1 on Power Supply Board to obtain 38 cpm ±5 cycles. If PCBA
10403600-XX, Revision A or later is installed, RV1 is no longer used. Re-
sistor R6 controls the cpm.
8.
Perform Spring Tension Adjustment procedures (see Chapter 6, Spring
Tension Adjustment on page 6-5) and Body Board Strain Gage Amp cali-
bration procedures (see Chapter 5, Body Board Strain Gauge Amp Adjust-
ment Procedure on page 5-7).
9.
Verify software settings (see Chapter 9, Program setting "F1" on page 9-3).
10.
Disconnect extension harness and reinstall PCB Chassis Assembly and
base plate.
Warning: Ensure base plate ground wire is attached to base plate.
F1
Fuse Holder
Summary of Contents for SEBRA 1040
Page 1: ...108755 US service manual Model 1040 Digital Blood Shaker...
Page 3: ......
Page 4: ...Printed in USA Copyright 1999 2010 Haemonetics Corporation...
Page 8: ...vi Preface P N 108755 US Manual revision AA...
Page 12: ...x Table of Contents P N 108755 US Manual revision AA...
Page 14: ...xii List of Figures P N 108755 US Manual revision AA...
Page 20: ...1 6 Introduction P N 108755 US Manual revision AA...
Page 36: ...3 10 Inspection Procedures P N 108755 US Manual revision AA...
Page 40: ...4 4 Parts Access P N 108755 US Manual revision AA...
Page 48: ...5 8 Strain Gauge P N 108755 US Manual revision AA...
Page 60: ...7 6 Tube Clamp Assembly P N 108755 US Manual revision AA...
Page 64: ...8 4 PCB Chassis Assembly Installation P N 108755 US Manual revision AA...
Page 86: ...11 4 Clamp Body Boss Replacement P N 108755 US Manual revision AA...
Page 98: ...13 8 Cap Assembly P N 108755 US Manual revision AA...
Page 102: ...14 4 Power Supply P N 108755 US Manual revision AA...
Page 105: ......