Link Assembly
6-5
P/N 108755-US, Manual revision: AA
S
PRING
T
ENSION
A
DJUSTMENT
Note: The objective of this procedure is to achieve an equal sound/noise level on
the up-stroke as well as the down-stroke.
1.
Listen for an uneven noise level between strokes; if even, adjustment is
adequate. Advance to step 7. If not even, advance to the next step.
2.
Stop shroud movement and turn off Shaker.
3.
Loosen the left and right nuts on the spring guide.
Figure 6-3, Nut Attached to Spring Guide (2x)
Figure 6-4, View of Spring Guide Looking at the Shaker from the Bottom
Link Y
Nut Attached to
Spring Guide
Audible
Alert
Audible Alert
Spring
Positioned on
Spring Guide
Summary of Contents for SEBRA 1040
Page 1: ...108755 US service manual Model 1040 Digital Blood Shaker...
Page 3: ......
Page 4: ...Printed in USA Copyright 1999 2010 Haemonetics Corporation...
Page 8: ...vi Preface P N 108755 US Manual revision AA...
Page 12: ...x Table of Contents P N 108755 US Manual revision AA...
Page 14: ...xii List of Figures P N 108755 US Manual revision AA...
Page 20: ...1 6 Introduction P N 108755 US Manual revision AA...
Page 36: ...3 10 Inspection Procedures P N 108755 US Manual revision AA...
Page 40: ...4 4 Parts Access P N 108755 US Manual revision AA...
Page 48: ...5 8 Strain Gauge P N 108755 US Manual revision AA...
Page 60: ...7 6 Tube Clamp Assembly P N 108755 US Manual revision AA...
Page 64: ...8 4 PCB Chassis Assembly Installation P N 108755 US Manual revision AA...
Page 86: ...11 4 Clamp Body Boss Replacement P N 108755 US Manual revision AA...
Page 98: ...13 8 Cap Assembly P N 108755 US Manual revision AA...
Page 102: ...14 4 Power Supply P N 108755 US Manual revision AA...
Page 105: ......