Control 

 

Only people that are familiar with the operation of the lifting devices and cranes may be entrusted with their 
operation. They must be authorized by the employer for the operation of the equipment. The employer must 
ensure that the operating instructions are available near the equipment and that they are accessible for the 
operating personnel.  

 

  Only use wire ropes, that do not exceed the maximum permitted diameter. 

  Put the wire rope properly on the pulley and ensure that the rope rests on the groove base. 

  Check screw connections. 

 

Commissioning 

 

8.1 

General 

The operator of the unit is responsible for the entire system. 

According  to  the  Ordinance  on  Industrial  Safety  and  Health,  a  hazard  analysis  must  be  carried  out  by  the 
operator. 

Observe the respective national standards, regulations and directives of the responsible bodies at the place 
of operation.  

 

 

NOTICE!

 

Hoists  up  to  1000  kg  capacity  and  without  motor-driven  trolleys  of  hoisting  unit  must  be  tested  by  a 
“qualified person” before putting into operation for the first time. 
Hoists  of  1000  kg  capacity  and  up  or  with  more  than  one  motor-driven  hoist  movement;  i.e.  lifting  and 
trolley movement, must be tested by a “licensed qualified person” before putting in operation. 
An  exception  is 

“hoists  ready  for  operation”  acc.  validated  national  regulations  with  EU-declaration  of 

conformity. 

Definition “qualified person” (former expert) 

A “qualified person” has learned, due to occupational training and experience and the job that the person has 
done, the skills needed to tests the material for one’s work. 

Definition “licensed qualified person” (former approved expert) 

A “licensed qualified person” has, due through special occupational training, knowledge about testing of the 
material for one’s work and knows the national accident prevention regulations and other prescriptions and 
technical regulations. This person must test the material for one’s work regularly with regard to design and 
kind of use. The license will be given to qualified person be the approved supervision authorities (ZÜS). 

 

Safety check 

 

 

Before putting into service initially or when putting back into service, it must be checked whether: 

  All fastening screws (if existent), socket pins, flap socket and safety devices are tightened and secured. 

 

 

 

capacity 

tool 

size 

usage 

 

250kg 

– 500kg 

 

 

M6 

axial securing   

Rope slip off guard 

        

1000kg 

M8 

2000 - 5000kg 

M10 

    

12500kg 

M16 

20000kg 

M20 

Summary of Contents for 108/99

Page 1: ...Rev 01 5 52 624 00 01 01 Pedestal 108 99 108 22 Installation Operating and Maintenance Instructions...

Page 2: ...changes Table of Contents 1 Information 3 2 Safety 3 2 1 Warning notice and symbols 3 2 2 Duty of care of the owner 3 2 3 Requirements for the operating personnel 4 2 4 Appropriate use 4 2 5 Basic sa...

Page 3: ...unpredictable hazards For any resulting damage or personal injury HADEF assumes no liability The unit was designed and built following a risk analysis and careful selection of the harmonized standard...

Page 4: ...r maintenance work DANGER In order to avoid severe injury please pay attention to the following when using the equipment Use protective clothes equipment Do not wear long hair hanging down open Do not...

Page 5: ...ked before delivery Do not throw or drop the accessories Use adequate means of transport Transport and means of transport must be suitable for the local conditions 3 2 Storage Store the accessories at...

Page 6: ...3 7 1000 180 135 13 10 2 2000 240 185 18 23 8 3200 300 230 23 44 5000 360 280 27 75 12500 530 420 38 195 20000 645 510 46 360 108 22 capacity kg rope pulley diameter max rope diameter mm weight outer...

Page 7: ...minimum dimension M from the centre of the drum to the centre of the sheave or from sheave to sheave must be observed Illustration 3 NOTICE Skewed running and non compliance with the minimum distances...

Page 8: ...with more than one motor driven hoist movement i e lifting and trolley movement must be tested by a licensed qualified person before putting in operation An exception is hoists ready for operation ac...

Page 9: ...service every 12 months check screw connections X check wear and tear of rope pulley X check smooth running of rope pulley X check smooth running of rope within pulley X equipment check by a qualified...

Page 10: ...s mandatory that all steps for decommissioning the machine are carried out in the indicated sequence First secure the working area for decommissioning leaving plenty of space Read the chapter Safety i...

Reviews: