![HABONIM C52 Series Installation, Operating, Maintenance Download Page 16](http://html.mh-extra.com/html/habonim/c52-series/c52-series_installation-operating-maintenance_576649016.webp)
Top Entry Trunnion Mounted Cryogenic Ball Valves – C52
Valves Series
Top Entry Trunnion Mounted Cryogenic Ball Valves – C52
Valves
Series
14
3.9.
Place the primary and secondary bonnet seals into the body.
3.10.
Place the stem thrust seal on the stem.
WARNING: For valves of size 2" and above verify that the thrust seal chamfer faces
down.
3.11.
Insert the stem into the bonnet with the threaded side in and carefully guide it up through the
stem.