Push POWER OFF.

Set the main circuit breaker to the

OFF

position.

Lock the main circuit breaker. Use an approved

lock with an approved safety tag.

For the VF 6-9 the worklight will be placed in the

location denoted as [1].

2

Start routing the cable to the top of the machine

[2], use the wire channels given in the kit to neatly

tuck away the cable as it is being routed.

3

Once above the machine connect the extension

so that the work light cable will now reach the

connection area denoted as [4].

Disconnect the inner LED cable and add the

splitter to the connection area [4]. Connect the

work light cable and reconnect the inner LED light

cable.

Conceal the excess cable under the cable cover

sheet metal [3] as best you can.

Use zip ties wherever necessary to keep cable in

place.

4

Actuate the light switch on the side of the

controller to test that the work light turns on.

Table Work Light - Installation - AD0475

Page 3 of 6 pages

Summary of Contents for AD0475

Page 1: ...following machines VF 6 12 UMC 500 1000 Prerequisites Parts Required P N 93 1000292 WORK TABLE LIGHT P N 93 2888 WRITING TABLE WORK LAMP KIT Using the components given in the kit assemble the work light as shown The bracket 1 will need to be changed to the provided bracket before proceeding with the install Table Work Light Installation AD0475 Page 1 of 6 pages ...

Page 2: ...Installation VF 6 to 9 Table Work Light Installation AD0475 Page 2 of 6 pages ...

Page 3: ...routed 3 Once above the machine connect the extension so that the work light cable will now reach the connection area denoted as 4 Disconnect the inner LED cable and add the splitter to the connection area 4 Connect the work light cable and reconnect the inner LED light cable Conceal the excess cable under the cable cover sheet metal 3 as best you can Use zip ties wherever necessary to keep cable ...

Page 4: ...e as it is being routed 3 Once above the machine connect the extension so that the work light cable will now reach the connection area denoted as 3 The work light cable may be long enough to meet the junction if not use the extension and neatly ziptie excess together Disconnect the inner LED cable and add the splitter to the connection area 3 Connect the work light cable and reconnect the inner LE...

Page 5: ...as it is being routed 3 Once above the machine connect the extension so that the work light cable will now reach the connection area denoted as 3 The work light cable may be long enough to meet the junction if not use the extension and neatly ziptie excess together Disconnect the inner LED cable and add the splitter to the connection area 3 Connect the work light cable and reconnect the inner LED ...

Page 6: ...e where the tool holders would be placed 2 Use the wire channels given in the kit to neatly tuck away the cable as it is being routed Connect the extension in the area specified 3 so that it may be routed into the tool changer area 3 Follow the cable 4 to find the inner LED cable connection and unplug it NOTE you may need to remove the sheet metal 5 on the inside of the machine to reach the cable ...

Reviews: