4
Artificial stone kit
– ROMA– Parts list
Installation instructions artificial stone kit ROMA
Note:
Prior to installation, check the exact position of the insert. Always ensure that the components
are installed level and plumb.
1. First install the lateral components of the fireplace kit in the dry state. Check to see if the
elements are level and plumb. Then mark the correct position using the pencil.
Remove all elements again and re-join in the sequence using the tile adhesive.
2. Mix the supplied adhesive (safety adhesive) with water until it has a consistency similar to
toothpaste. Glue all elements together and to the wall. Clean and lightly moisten the bonding
surface to achieve optimum adhesive strength. Remove excess adhesive with the trowel and a
moist cloth. Now the joints compensated with acrylic.
3. Once the kit has been finish painted, finally glue the base plates.
Item No.
No. Quantit
y
Designation
Finish
Material
0621850100100
1
1
Lateral part left
Artificial stone Artificial stone
0621850100200
2
1
Lateral part right
Artificial stone Artificial stone
0621850100300
3
1
Base
Artificial stone Artificial stone
0621850100400
4
1
Base blind left
Artificial stone Artificial stone
0621850100500
5
1
Base blind right
Artificial stone Artificial stone
0631850110600
6
1
Base plate front
Artificial stone Artificial stone
0621850100700
7
1
Fireplace hood bottom
Slate
Artificial stone
0621850100800
8
1
Fireplace hood top
Artificial stone Artificial stone
0631850110900
10
1
Base plate left
Artificial stone Artificial stone
0631850110901
10
1
Base plate right
Slate
Artificial stone
0631850110902
10
1
Ledge plate left
Slate
Artificial stone
0631850110903
10
1
Ledge plate right
Slate
Artificial stone
0621850101100
11
1
Air grill top
Steel plate
Steel plate
0621850100900
9
1
Air grill lateral
Steel plate
Steel plate
0621800105000
1
Adhesive