2-1
2
Installing the AP
Installation flowchart
Figure2-1 Installation flowchart
Pre-installation tasks
Before installing the AP, perform the following tasks:
•
Connect the AP to a power source and the network. Examine the LEDs to verify that the AP is
operating correctly. For information about AP LEDs, see "
•
Record the MAC address and serial number at the rear of the AP for future use.
Determining the installation position
Determine the installation position for the AP by observing the following principles:
•
As few obstacles (for example, walls) as possible exist between the AP and clients.
•
The AP is far away from electronic devices (such as microwave oven) that might generate
radio frequency (RF) noise.
•
The AP does not hinder people’s daily work and life.
•
The place is not water seeping, water soaking, or condensing.
Start
Complete pre-installation tasks
Determine
the mounting option
Wall mounting
Ceiling mounting
Connect the AP to the power
source
Connect the AP to the network
End
Install the AP