
Installation Manual
H3C S9500 Series Routing Switches
Chapter 3 Installing the Switch
3-27
3.10 Verifying the Installation
Warning:
Make sure that you have turned off the power before checking the
installation in case of bodily injury and device damage.
After installing the switch, verify the installation against the following list.
For the successful installation, all items must be normal.
Table 3-5
Installation checklist
Item
Normal
Abnormal
(Description)
Console cable
PGND wire
Power cables
SRPUs
LPUs/service boards
Fan tray(s)
PSUs