
Installation Manual
H3C S9500 Series Routing Switches
Chapter 3 Installing the Switch
3-1
Chapter 3 Installing the Switch
The S9500 series are designed for indoor applications.
Warning:
Do not touch any exposed wires, terminals or any parts labelled with a
high-voltage hazard warning to avoid bodily injury.
3.1 Installation Flow
Start
Confirm installation preparation
Confirm installation position
Mount the switch in a rack
Install the switch on a workbench
Install a PSU
Install boards
Install PoE power supply
(optional)
Connect the PGND wire
Finish
Verify the installation
Connect interface cables
Figure 3-1
Installation flow
3.2 Confirming Installation Preparation
z
Make sure that you have read Chapter 2 Preparing for the Installation
carefully.