Installation Manual 
H3C S9500 Series Routing Switches 

Appendix B  Installation of B68 Cabinet

 

B-27 

 

(1) Retaining nut of the cabinet 

 

(2) Cabinet foot 

 

(3) Retaining nut of anchor plate

 

(4) Lower enclosure frame of the cabinet 

 

Figure B-29 

Cabinet feet fastening  

B.3.7  Cabinet Combination Connection 

When two or more cabinets are to be combined, combination connection between 
cabinets should be conducted. As shown in Figure B-30, first remove top covers of all 
cabinets, then rotate the combining plates on top of the cabinets by 180° and fasten 
them, and use flat washer, spring washer, bolt and nut to combine the combining plates 
as shown in Figure B-31. Figure B-30 shows the position of combining plate before it is 
rotated, and Figure B-31 shows the its position after it has been rotated.  

Summary of Contents for S9500 Series

Page 1: ...4 Cabinet Leveling B 6 B 2 5 Cabinet Combination Connection B 7 B 2 6 Cabinet Fastening B 9 B 2 7 Insulation Test B 11 B 3 Cabinet Installation on Raised Floor B 13 B 3 1 Introduction to Support and Slide Rail B 14 B 3 2 Installation Flow B 16 B 3 3 Support Positioning B 17 B 3 4 Installation of Support and Slide Rail B 20 B 3 5 Installing Supporting Accessories of Raised Floor B 25 B 3 6 Cabinet ...

Page 2: ...nents 3 After the installation make the all around check on the cabinet so as to find the defects and make the timely handling Clean the stains resulting from the installation B 1 2 Introduction to the Installation According to different floors in the equipment room the B68 22 cabinet can be installed on the cement ground or on the raised floor The brief installation procedure includes 1 Cabinet f...

Page 3: ...ntroduction to Anchor Plate The anchor plate of the B68 22 cabinet is shown in Figure B 1 and the installations of the anchor plate and cabinet feet are shown in Figure B 2 1 Cabinet foot fixing connection trough 2 Anchor plate fixing connection hole Figure B 1 Anchor plate of the B68 22 cabinet 1 Cabinet foot 2 Retaining nut of the cabinet 3 Retaining nut of anchor plate 4 Bolt M12 70 5 Spring wa...

Page 4: ...earance is required around the B68 22 cabinet II Drawing lines According to the reference dimension and cabinet foot location dimension in the construction plane design diagram determine the location of the cabinet installation hole measure several marking out points mark out two lines which are parallel with the reference and whose spacing is 720mm According to the design requirements determine t...

Page 5: ...ion mark 3 Cabinet outline 4 Rear of cabinet 5 Wall or reference body Figure B 4 Installation holes and cabinet foot location marks of a single cabinet 1 M12 expansion bolt hole mark 2 Cabinet foot location mark 3 Cabinet outline 4 Rear of cabinet 5 Wall or reference body Figure B 5 Installation holes and cabinet foot location marks of two cabinets ...

Page 6: ...rd or slippery chisel a pit at the hole mark to help position the bit Marking and drilling are the fundamental work for hardware installation Any poor precision may cause great inconvenience for the follow up jobs Caution Keep the depth of the hole between 52mm and 60mm Otherwise the expansion bolt cannot be installed and fastened properly IV Installing expansion bolts Prior to installation clean ...

Page 7: ...Leveling I Locating the cabinet Move the cabinet to the planned location with its feet aligned with the corresponding foot location marks II Leveling the cabinet Place a horizontal ruler in two orthogonal directions on top of the cabinet to check the cabinet levelness If the cabinet is not leveled loosen the retaining nuts on the cabinet feet with a wrench and turn the cabinet foot finely to adjus...

Page 8: ...nets are used it is required to combine them Skip this section if not necessary When combining cabinets first remove the top covers of the cabinets as shown in Figure B 8 and then rotate the combining plates on top of the cabinets by 180o After fastening use flat washer spring washer bolt and nut to connect the combining plates of two neighbor cabinets as shown in Figure B 9 Figure B 8 shows the p...

Page 9: ...pper enclosure frame of the cabinet 2 Combining plate 3 Bolt M6 10 4 Top cover of the cabinet Figure B 8 Removal and installation of the top cover of B68 22 cabinet 1 Nut M8 2 Flat washer Φ8 3 Spring washer Φ8 4 Bolt M8 35 5 Combining plate Figure B 9 Installation of combining plate of B68 22 cabinet ...

Page 10: ...cabinets After combination top covers are to be installed again B 2 6 Cabinet Fastening I Installing anchor plate Install the anchor plate of the B68 22 cabinet according to Figure B 10 Press the anchor plate against the cabinet feet Two anchor plates are required for one cabinet Caution The anchor plate must be installed in the direction as shown in Figure B 10 ...

Page 11: ...2 cabinet II Installing insulating parts and fixing anchor plate First put the insulating washer under the anchor plate and align it with the expansion bolt hole one anchor plate needs 2 insulating washers Then screw the M12 70 bolt into the expansion bolt hole through the anchor plate Install the accessories such as insulating covering and big flat washer according to Part A in Figure B 11 and th...

Page 12: ...ering 9 Expansion tube 10 Expansion nut Figure B 11 Fastening of anchor plate of the B68 22 cabinet III Fastening retaining nut of anchor plate Fasten the retaining nut of the anchor plate according to part B in Figure B 11 B 2 7 Insulation Test Measure the resistance value between the fixing bolt M12 70 and the anchor plate with a Multimeter If the resistance value measured is larger than five me...

Page 13: ...ulating covering or insulating washer is installed or whether the insulating parts are damaged Afterwards reinstall the anchor plate and repeat the insulation test Figure B 12 shows the installation of a single cabinet on the cement ground and Figure B 13 shows the installation of two cabinets on the cement ground Figure B 12 Installation of a single cabinet on the cement ground ...

Page 14: ... cabinet is installed in the equipment room with the raised floor the H800 series supports are adopted Caution The feet are insulated The anchor plate components include insulating units During construction make sure that the insulating units are correctly installed so that the whole set of equipment is insulated from the ground before the ground wire is connected thus effectively meeting the insu...

Page 15: ...nience of floor paving and cable wiring in the equipment room The support is welded with steel sheet 1 Number of the supports used In the combined cabinets installation N cabinets in one row will be supported with the N 1 supports as shown in Figure B 14 1 2 1 Support 2 Slide rail Figure B 14 B68 22 cabinet installation on slide rail 2 Appearance of support The appearance of the H800 series suppor...

Page 16: ...stable and the other one is of fixed height The adjustable ranges of the models are shown in Table B 1 Table B 1 Table of height of the H800 series supports Model Suitable height of raised floor mm I 210 255 II 256 345 III 346 525 IV Customized according to the floor height minimum height 100mm Note The height of the raised floor refers to the distance between the upper plane of the raised floor a...

Page 17: ...oduction to slide rail The equipment can move along the slide rail for the convenience of location adjustment The slide rail integrates several supports and cabinets together so as to keep the cabinet level and enhance the connection The dimensions of the slide rail are shown in Figure B 16 Each is 600mm long and two are used for each cabinet Figure B 16 Dimensions of slide rail B 3 2 Installation...

Page 18: ...n at the front and rear doors of the cabinet as shown in Figure B 19 Figure B 20 and Figure B 21 At least 800mm clearance is required around the B68 22 cabinet II Drawing lines According to the reference dimension and support dimension in the construction plane design diagram determine the support installation location measure several marking out points mark out two lines which are parallel with t...

Page 19: ...ocations of two cabinets and Figure B 21 shows the installation hole locations of multiple cabinets Figure B 18 Installation hole locations of the H800 series supports 1 M12 expansion bolt hole mark 2 Cabinet outline 3 Rear of cabinet 4 Wall or reference body Figure B 19 Installation hole locations of a single cabinet ...

Page 20: ...1 M12 expansion bolt hole mark 2 Cabinet outline 3 Rear of cabinet 4 Wall or reference body Figure B 20 Installation hole locations of two cabinets 1 M12 expansion bolt hole mark 2 Cabinet outline 3 Rear of cabinet 4 Wall or reference body Figure B 21 Installation hole locations of multiple cabinets ...

Page 21: ...he fundamental work for hardware installation Any poor precision may cause great inconvenience for the follow up jobs Caution Keep the depth of the hole between 52mm and 60mm Otherwise the expansion bolt cannot be installed and fastened properly B 3 4 Installation of Support and Slide Rail I Support Installation 1 Installing expansion tube and expansion nut Prior to installation clean the dust ins...

Page 22: ... and fasten the height retaining bolt to 45 Nm with a torque spanner Here first fasten the middle bolts and then the side bolts See Figure B 23 3 Installing and fixing the support Clean the ground and support surface align the support installation hole with the corresponding expansion bolt according to Figure B 23 and fix the support on the ground with the bolt spring washer and big flat washer Th...

Page 23: ... first and then the side ones II Installing slide rail 1 Installing T nuts Before the slide rail is installed put the T nuts into the lower trough of the slide rails The T nuts are used to fix the slide rails and the angle plate for floor bracket Each cabinet needs eight T nuts four in each of the slide rail two of them are used for floor bracket assemblies Otherwise after the slide rail is instal...

Page 24: ...rse and longitudinal directions the segments of the slide rail with a horizontal ruler to check whether the bubble in the horizontal ruler is right in the middle If it is horizontal screw tight the bolts in sequence and measure the level once again as shown in Figure B 26 Otherwise loosen the screws and adjust them by adding or removing the washers After the slide rail is installed the following r...

Page 25: ...ng washer Φ12 3 Flat washer Φ12 4 Bolt M12 20 5 Washer 6 Slide rail 7 Shield of slide rail Figure B 25 Fixing and level adjustment of slide rail and support 1 Transverse measurement with horizontal ruler 2 Longitudinal measurement with horizontal ruler 3 Slide rail Figure B 26 Horizontal measurement of slide rail ...

Page 26: ...Figure B 27 Caution Make sure to differentiate the angle supports for the left slide rail and the right slide rail before installation 1 Flat washer Φ12 2 Spring washer Φ12 3 Bolt M12X20 4 T nut 5 Angle plate for floor bracket 6 Angle support of left slide rail 7 Angle support of right slide rail Figure B 27 Installation of fixing angle plates for floor bracket and angle supports for left and righ...

Page 27: ...face of the raised floor then fasten the bolt M12X35 B 3 6 Cabinet Leveling I Moving the cabinet into position Lift the cabinets on the slide rails one by one and align centers of the cabinet feet with the centers of the trough on the slide rails Meanwhile align all cabinets Adjusting the cabinets Place a horizontal ruler in two orthogonal directions on top of the cabinet to check the cabinet leve...

Page 28: ... When two or more cabinets are to be combined combination connection between cabinets should be conducted As shown in Figure B 30 first remove top covers of all cabinets then rotate the combining plates on top of the cabinets by 180 and fasten them and use flat washer spring washer bolt and nut to combine the combining plates as shown in Figure B 31 Figure B 30 shows the position of combining plat...

Page 29: ...pper enclosure frame of the cabinet 2 Combining plate 3 Bolt M6 10 4 Top cover of cabinet Figure B 30 Removal and installation of top cover of the B68 22 cabinet 1 Nut M8 2 Flat washer Φ8 3 Spring washer Φ8 4 Bolt M8 35 5 Combining plate Figure B 31 Installation of combining plate of the B68 22 cabinet ...

Page 30: ... trough of the slide rail Two T nuts should be installed into the upper trough of the slide rail on each side under one cabinet each anchor plate needs two T nuts II Installing anchor plate Install the anchor plate of the B68 22 cabinet according to Figure B 32 Press the anchor plate against the cabinet feet Two anchor plates are required for one cabinet Caution The anchor plate must be installed ...

Page 31: ...ail Screw the M12 X 35 bolt into T nut through the anchor plate At the time it should be noted that such related accessories as insulating covering and big flat washer must be installed according to part A in Figure B 33 Then fasten the bolt force moment to 45 Nm 1 Retaining nut of anchor plate 2 Anchor plate of the B68 22 cabinet 3 Cabinet M16 foot 4 Insulating washer of anchor plate 5 Bolt M12X3...

Page 32: ...binet is not insulated from the earth In this case remove all anchor plate parts to check whether the insulating covering or insulating washer is installed or whether the insulating parts are damaged Afterwards reinstall the anchor plate and repeat the insulation test B 3 10 Floor Recovery According to the actual site status cut the raised floor around the cabinet and then recover the floor Figure...

Page 33: ...Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet B 32 1 Framework of raised floor 2 Side floor bracket Figure B 34 Recovery installation of raised floor ...

Page 34: ...einforcement measures should be followed for the cabinet according to the following procedures Skip this section if not necessary To reinforce the cabinet the following procedures should be covered I Installing quakeproof angle plate Rotate the quakeproof angle plate on the upper enclosure frame of the cabinet by 180º and then fasten it again Figure B 36 shows the position of the quakeproof angle ...

Page 35: ...r the ceiling of the equipment room according to Figure B 38 Figure B 39 shows the quakeproof reinforcement for multiple cabinets Caution z The top cover of the cabinet must be removed before the installation as shown in Figure B 36 z Insulating washer or plate must be installed during the quakeproof reinforcement 1 Quakeproof angle plate Figure B 36 Position of quakeproof angle plate before reinf...

Page 36: ...Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet B 35 1 Quakeproof angle plate Figure B 37 Position of quakeproof angle plate after reinforcement ...

Page 37: ...Appendix B Installation of B68 Cabinet B 36 1 Insulating plate 2 Expansion bolt M8 80 3 Angle connector 4 Insulating covering 5 Big washer Φ8 6 Nut M8 7 Channel beam 8 Bolt M8 20 9 Quakeproof angle plate Figure B 38 Quakeproof reinforcement for one cabinet ...

Page 38: ...Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet B 37 Figure B 39 Quakeproof reinforcement for multiple cabinets ...