II. Installation and removal
The installation and removal procedures of CX4 interface modules are the same as
those of XFP interface modules. Refer to 3.5.1 III. “Installation procedure” on page
错
误!未定义书签。
and 3.5.1 IV. “Removal procedure” on page
错误!未定义书签。
for
it.
3.6 Installing and Removing the Dedicated CX4 Cable
3.6.1 Installing the Dedicated CX4 Cable
Note:
Make sure that you have installed a CX4 interface module before installing the
dedicated CX4 cable.
1) Wear an ESD-preventive wrist strap and verify the ESD-preventive wrist strap
properly grounded. Then take out the dedicated CX4 cable from the package.
2) Horizontally insert the dedicated CX4 cable connector into the CX4 port of the
switch.
3.6.2 Removing the Dedicated CX4 Cable
1) Wear an ESD-preventive wrist strap and verify the ESD-preventive wrist strap is
properly grounded.
2) Hold the CX4 cable connector, pull the handle at the end of the connector to
horizontally unplug the CX4 cable connector from the CX4 port.
Caution:
z
Dedicated CX4 cables of the S5500-EI series are hot pluggable.
z
Make sure that the cable bending radius is no less than eight times the cable
diameter when connecting the CX4 cable.
3.7 Verifying the Installation
Check the following:
z
The selected power supply complies with the one labeled on the switch.
z
The grounding cable is connected.