8
www.myhtec.com
Fig. 2: Set-up example with Solar Module
2.) Setting up for experiments with electrolyzers:
2.) Setting up for experiments with electrolyzers:
The components are connected as follows:
3.) Setting up for experiments with fuel cells:
3.) Setting up for experiments with fuel cells:
The components are connected as follows:
Ensure the correct polarity (red = “+”, black = “-”)!
Ten different resistance values can be set using the rotary switch. Every rotary switch position
produces another operating point.
Ensure the correct polarity (red = “+”, black = “-”)!
Ten different resistance values can be set using the rotary switch. Every rotary switch position
produces another operating point.
Port 1
Port 1
Port 1
Port 1
Port 2
Port 2
Port 2
Port 2
UU
UU
II
II
Solar module or wind
turbine
Multimeter
Voltage measurement
Multimeter
Voltage measurement
Multimeter
Current measurement
Multimeter
Current measurement
Electrolyzer
Fuel Cell
- Empty-