![background image](http://html1.mh-extra.com/html/guzzanti/gz-678/gz-678_user-manual_2279513006.webp)
6. EXTRACTOR HOOD INSTALLATION INSTRUCTIONS
6.1.
Select the operation mode and place for installation of the extractor hood
6.2.
Remove the extractor hood from the packaging.
6.3
. Check the work of the extractor hood, connect it to the electric network and check all its functions.
6.4
. Make marks for the mounting holes of the body on the wall. To do this, put the paper mold with
markings of 4 holes in the back wall of the body (points
A, B, C, D,
see the installation scheme), put the mold
to the wall on the needed height indicated above, and align it on the level.
6.5.
Mark and drill holes in
points A, B, C, D with drill Ø7mm 40mm in depth.
6.6.
Install the dowels in the perforated holes and turn in four screws PTG 4,5x40 through the holes in the
mounting bracket.
6.7
. In case of necessity install pipe to pipe adaptor for air duct
(Ø150/120)
and install air duct
(pic.4).
6.8
.
If the extractor hood is to be operated in an air-to-chimney mode, mount the air duct of the selected
diameter in accordance with the instructions, ensuring that it is tight.
Pic.4
Summary of Contents for GZ 678
Page 9: ...ELECTRICAL SCHEMATIC DIAGRAM...
Page 17: ...SCHEMAT ELEKTRYCZNY PODSTAWOWY...
Page 25: ...Z KLADN ELEKTRICK SCH MA...
Page 33: ...Z KLADN ELEKTRICK SCH MA...
Page 41: ...ELEKTROMOS DIAGRAM...