en
17
Installation Instructions
Sombra Ceiling Unit
A
Hood body
B
Filter glass fronted underside
C
Support frame for false ceiling
D
Support plate, blank
E
Connection nozzle
F
Electrical connection
G
Suspension points
H
Stuffing boxes for supply line
1
. Make the necessary preparations for
installation of the hood on site
-
cover
kitchen appliances, etc.
2
. Prepare suitable on
-
site exhaust air
facilities in the ceiling. Specify the opera-
tor side of the hood on the side with the
control panel.
3.
To achieve an optimum extraction
capacity, determine the position of the
extractor hood centrally over the hob
(use a plumb line for help).
Summary of Contents for SOMBRA II 68 EM
Page 9: ...de 9 Montageanleitung Sombra...
Page 10: ...de 10 Flachkanalstutzen Absaugrichtung ndern mit seitlichem Stutzen A Version...
Page 20: ...en 20 Sombra Installation Instructions with lateral support with threaded rods...
Page 21: ...en 21 with lateral support version A...
Page 30: ...fr 30 version A avec raccords lat raux...
Page 40: ...it 40 Istruzioni di montaggio Sombra...
Page 51: ...es 51 Cambio salida de humos rectangular con salida lateral A Versi n...
Page 52: ...es 52 Cambio salida de humos rectangular...
Page 53: ...es 53...
Page 59: ...nl 59 Montagekit 1 tapstang Art Nr 41996000 M8 x 1000mm Montagekit voor standaard toestellen...
Page 63: ...nl 63 Montagehandleiding Sombra met zijdelingse buis met tapstangen...
Page 64: ...nl 64 Buis voor vlak kanaal afzuigrichting veranderen met zijdelingse buis A versie...
Page 65: ...nl 65 Buis voor vlak kanaal afzuigrichting veranderen...