![Gunter & Hauer EOM 557 BTEL Instruction Manual Download Page 22](http://html1.mh-extra.com/html/gunter-and-hauer-0/eom-557-btel/eom-557-btel_instruction-manual_2278934022.webp)
21
Type-B(SMEG door structure)
The steps of taking down glass of door:
keep the door flat on table
,
Put your hand on bottom of glass of door and lift up,take off the
button
,
Lift up the button which is on top of glass until the whole glass is took down.
The steps of installing the glass of door
Let the bottom of glass of door lean on the convex plate of door frame, aim at the button
and press it. Press flat the glass of door, give the top of glass a hard push and lock the
button.
Regular inspections
Besides keeping the cooker clean, you should:
1. Carry out periodic inspections of the control elements and cooking units of the
cooker. After the guarantee has expired you should have a technical inspection of the
cooker carried out at a service centre at least once every two years.
2. Fix any operational faults
Carry out periodical maintenance of the cooking units of the cooker.
Caution!
All repairs and regulatory activities should be carried out by the appropriate service
centre or by an appropriately authorized fitter.
Side rack kit assemble
To assemble the side racks, remove the two frames, lifting them away
from the spacers.
Secure the two frames with the guide rails, using
the guide rails using the holes provided on the oven walls.The holes
for the left frame are situated at the top, while the holes for the right
frame are at the bottom.