Maintenance and treatment
1. Attention – threat to life by electric shock! Disconnect
the appliance before each cleaning and treatment.
Attention – risk of appliance damage! Never clean the
appliance under running water or rinse water. Do not use
aggressive cleaning means or hard items for cleaning as
they could damage the appliance. Occasionally wipe the
appliance with a moist cloth.
2. Regularly check the steel cable (m) in its entire length for
any damage and whether the limit switch (e) is not faulty
(lift the reel up until the tension weight (l) activates the
tension clamp (c)).
3. If the steel cable (m) is damaged (broken or tattered,
see
pic. 3
) then replace it with an original spare cable. When
installing the cable, you must not in any case forget the
tension weight (l) so that safe tension in the end position
was ensured.
4. Regularly grease the haul-back block bearing (n) with little
oil.
5. When the appliance is switched off check the mobility of
all mechanical construction parts of the reel.
6. A specialist must check the appliance at least once a
year. The test result needs to be recorded in the Check
Book.
7. Clean the steel cable and grease it with oil once a month.
EU Declaration of Conformity
We,
Güde GmbH & Co. KG
Birkichstraße 6
74549 Wolpertshausen
Germany
hereby declare the conception and construction of the below-
mentioned appliances correspond - at the type of construction
being launched - to appropriate basic safety and hygienic
requirements of EC Directives.
In case of any change to the appliance not discussed
with us the Declaration expires.
Marking of appliances:
GSZ 100/200 electric cable reel
Order No.:
55050
Appropriate EU Directives
:
2006/42 EG
2004/108 EG
Harmonised standards used:
EN 14492-2: 2006
EN 60204-32:1998
ZEK 01.2-08/12.08
EN 55014-1:2006
EN 61000-3-3:1995+A1+A2
EN 61000-3-2:2006
EN 55014-2:1997+A1
EN 55014-1:1993+A1+A2
EN 55014-2: 1997
EN 61000-3-2: 1995+A1+A2
EN 61000-3-3: 1995
Certification place:
TÜV Rheinland Product Safety GmbH - Am Grauen Stein
D-51105 Köln
Date/producer signature: 04.10.2011
Signed by:
Mr Arnold, Managing Director
Technical Documentation: J. Bürkle; FBL, QS
13