G
ua
rd
ia
n
Fa
ll
Pr
ot
ec
tio
n
6
30
5
S.
2
31
st
S
t.
, K
en
t,
W
A
9
80
32
p
ho
ne
: (
80
0)
4
66
-6
38
5
f
ax
: (
80
0)
6
70
-7
89
2
w
w
w
.g
ua
rd
ia
nf
al
l.c
om
11
Optional Gusset Attachment Application
1) Install guardrail post receiver on selected
parapet wall with (2) 2½” long, 14-10
screws. Ensure guardrail post receiver is set
at a 90º angle, and top of post receiver is
even with top of parapet wall.
2) Fit gusset to top of guardrail post receiver. Ensure gusset is flush with top of parapet well. Insert guardrail post
through gusset and fully into guardrail post receiver. Guardrail post rungs must face in toward work surface. Insert
locking pins into bottom hole and forth hole up from bottom as shown in step C. Fully embed (5) 16d nails into
corresponding holes in gusset as shown in step D.
Side view of fully
completed gusset
application.
A.
B.
C.
A.
B.
D.