Page 31
Issue 07/2011
Installation of generator
Installation of generators of model 132
3.5
Installation of generators of model 132
y
To install the generators of model 132, proceed according to the
descriptions in this section.
y
Prior to installation, read the safety instructions in section 3.1 and sections
3.2 to 3.4 attentively and follow the instructions and information therein.
Warning
Risk of accident and injury
y
Incorrectly attached lifting equipment can lead to accidents.
►
Secure the lifting equipment to the generator exclusively
using the ring screws provided.
►
Only use suitable lifting equipment.
3.5.1
Installation dimensions and assembly
During assembly, observe the minimum clearances and specifications for
cooling in the following section.
Dimensions, generator
ð
drawing sheet in the Appendix.
y
Secure the generator with at least four
mounting screws (minimum M12 or
comparable, bolt grade min. 8.8).
y
The attachment must be permanent and
resistant to shock and vibrations.
y
Use suitable means to prevent the screws
from coming undone by themselves, e.g. via
a tension ring according to DIN 128.
y
Tightening torque for mounting screws:
M = 25 Nm
y
Permissible load of the shaft: Fr
max
= 2,000N
(measured in 50 mm axial clearance from the
point where the shaft exits the bearing plate)
Fa
max
= 200 N
4 Mounting screws
Frmax
Famax
Summary of Contents for DWG (BL) 13/7-2 ZE
Page 87: ...Page 87 Issue 07 2011...