GTO FM143 Installation Manua Download Page 8

FM143/FM144 Installation Manual [5/20/21]

8

Wiring the lock to MM271 and MM260 
Operator

POWER

LED3

EDGE
COM

LOCK+

LOCK -

M_BLK
M_RED

GRN

VAR3

VAR3

VAR1

VAR4

VAR5

VAR6

CYCLE

EXIT

SAFETY

COM

CHGR

CHGR

POWER

LED3

EDGE
COM

LOCK+

LOCK -

M_BLK
M_RED

GRN

VAR3

VAR3

VAR1

VAR4

VAR5

VAR6

CYCLE

EXIT

SAFETY

COM

CHGR

CHGR

-

+

Wiring the lock to MM360 Operators.

NOTE:

 Dip switch 4 must be set to LOCK (OFF).

CHARGING
POWER

RCVR

GRN

BLK

RED

EXIT

SAFETY

EDGE

CYCLE

COMMON

LINK

AUX

OUT

SOLAR

INPUT

18VAC/

H       L

-

+

1

ON

2

3

4

15

CHARGING
POWER

RF

PULL-PUSH
MODE1
MODE2
LOCK/BEACON

OFF

120

CLOSE TIME

SET

LIMIT

LEARN

REMOTE

AUX  OUT

SOLAR

PANEL

18VAC

RCVR

GRN

BLK

RED

EXIT

SAFETY

EDGE

CYCLE

COMMON

LINK

1

ON

2

3

4

PULL-PUSH
MODE1
MODE2
LOCK/BEACON

Summary of Contents for FM143

Page 1: ...various mounting applications no mounting hardware is provided with the Automatic Gate Lock All necessary mounting hardware can be obtained from your local hardware store all other hardware is provided This manual shows two examples of the most common installations and should provide insight into most other applications If you have any questions during installation please call 800 543 1236 for tec...

Page 2: ...ons Parts Included A Lock with 20 of low voltage wire B Lock Receiver C Clevis Pin D Locking Cap E Lock Board Battery Lead Wires F White Wire motor lead to lock board G Lock Control Board Lock PCB Not required for most systems H 2 Double Spade Tongue terminals I 6 Nylon Cable Tie J Wire Connector K Lock Keys for manual release L Lock Decal AUTOMATIC GATE LOCK D E F G H I J K L C 3 Diameter B 2 2 A...

Page 3: ... 2 Clamp receiver and lock together with receiver pin hole and lock slot aligned against the gate post mark their positions to drill receiver holes see Illustration B and C page 4 The receiver must be mounted with carriage bolts not U bolts to allow lock to seat properly Fasten the receiver to the gate post Step 3 Hold latch open with key to operate gate and check closed limit and lock alignment D...

Page 4: ...s before drilling holes in fence post Illustration B Iron or Aluminum Tube Fence and Gate Installation Illustration C Chain Link Fence and Gate Installation Illustration D Locking Cap Assembly Clevis Pin Receiver Locking Cap GTO Automatic Gate Lock Carriage bolts washers and nuts not provided size of fasteners depends on the gate Remember to check the alignment and mark positions before drilling h...

Page 5: ...hange the sequencing on your gate opener Follow the instructions in your gate opener installation manual for programming dual gate sequencing Step 1 With the gate in the closed position determine the best location for the lock and lock receiver The lock and receiver must be level and aligned with the opener Also the lock should have a solid surface or cross member to provide stability see illustra...

Page 6: ...ck is keyed for manual release Should the electronic release be disabled for any reason simply use the key to manually open the lock Keys are unique for security purposes and can not be replaced by Nortek Security Control A locksmith will be required if all copies of the keys are lost ...

Page 7: ...s operators WHT GRN LOCK PWR AUX RLY POWER INPUT CONTROL OUTPUTS 2ND OPERATOR 18 VOLT TRANSF OR SOLAR PANEL 1 2 Wiring the lock to MM272 HD272 MM262 MM362 MM462 Operators and Linear Pro 2000XLS series VAR5 K1 PF1 K2 BATT B K3 K4 VAR4 VAR3 VAR2 VAR1 MIN MAX OFF REMOVE JUMPER FOR PUSH TO OPEN OPTION 120 SEC STALL FORCE OPEN JOG CLOSE PWR SET LIMIT 1st OPR 2nd OPR STATUS AUTO CLOSE SFTY EXIT CYCLE ED...

Page 8: ...R1 VAR4 VAR5 VAR6 CYCLE EXIT SAFETY COM CHGR CHGR Wiring the lock to MM360 Operators NOTE Dip switch 4 must be set to LOCK OFF CHARGING POWER RCVR GRN BLK RED EXIT SAFETY EDGE CYCLE COMMON LINK AUX OUT SOLAR INPUT 18VAC H L 1 ON 2 3 4 15 CHARGING POWER RF PULL PUSH MODE1 MODE2 LOCK BEACON OFF 120 CLOSE TIME SET LIMIT LEARN REMOTE AUX OUT SOLAR PANEL 18VAC RCVR GRN BLK RED EXIT SAFETY EDGE CYCLE CO...

Page 9: ...ntrol board lead wire Attach the BLACK lock board battery lead wire to the double spade tongue connector with the BLACK control board Lead Wire Step 6 Connect the WHITE wire from the lock board directly to the PRIMARY OPERATOR terminal block along with the power cable wire from the opener arm Connect the WHITE wire to the RED terminal for a Pull to Open installation or connect WHITE wire to the BL...

Page 10: ...ll does not operate properly contact Technical Support Technical Support 800 543 1236 IMPORTANT For the optimum service and safety find the ideal stall force sensing setting for your gate opener Depending on the weight of your gate the ideal setting will be just enough to move your gate without self obstruction stopping or reversing due to its own weight yet sensitive enough to reverse and stop wh...

Page 11: ... due to failure to follow the manufacturer s instructions or arising from improper installation storage or maintenance EXCEPT FOR THE EXPRESS WARRANTIES EXPRESSLY CONTAINED IN THIS LIMITED WARRANTY NORTEK CONTROL MAKES NO OTHER PRODUCT REPRESENTATIONS OR WARRANTIES OF ANY KIND ALL OTHER WARRANTIES EXPRESS OR IMPLIED INCLUDING IMPLIED WARRANTIES OF TITLE NON INFRINGEMENT MERCHANTABILITY AND FITNESS...

Page 12: ...ity Control 5919 Sea Otter Place Carlsbad CA 92010 USA Phone 800 421 1587 www mightymule com www nortekcontrol com www linear solutions com 2021 Nortek Security Control LLC All rights reserved Mighty Mule GTO Access Systems and Linear are registered trademarks of Nortek Security Control LLC ...

Reviews: