GSWeb Playground Equipment IGLOO NET Sphere M Installation Manual Download Page 13

GSWeb Playground Equipment

E-mail) [email protected]

Website) www.gswebplay.com

Tel) +82 (0)55 326 9025

Fax) +82 (0)55 326 9026

65, Saengnim-daero 259beon-gil, Saengnim-Myeon

Gimhae-si, Gyeongsangnam-do, 50802, Republic of Korea

IGLOO NET

MODEL NO.

Rev_0

2018.04.

Sphere M

13

Maintenance

C. Routine maintenance

To reduce accidents, the owner or operator should ensure that an appropriate routine maintenance schedule is established, implemented and 

maintained. This should take into account local conditions and the manufacturer's instructions that can affect the necessary inspection 

frequency. The schedule should list the components to be maintained and should also give procedures for dealing with complaints and 

breakdowns.

The routine maintenance of playground equipment and surfaces should consist of preventative measures to maintain their level of safety, 

performance and compliance with the relevant part(s) of EN 1176. Such measures should include:

a) tightening of fastenings;

b) re-painting and re-treatment of surfaces;

c) maintenance of any impact attenuating surfaces;

d) lubrication of bearings;

e) marking of equipment to signify loose fill finished surface level;

f) cleaning;

g) removal of broken glass and other debris or contaminants;

h) restoring loose fills to the correct level; and

i) maintenance of free space areas.

D. Corrective maintenance

Corrective maintenance should include measures to correct defects, or th re-establish the necessary levels of safety of the playground 

equipment and surfaces. Such measures should include:

a) replacement of fastenings;

b) welding of welding repairs;

c) replacement of worn or defective parts; and

d) replacement of defective structural components.

E. Personal safety

Repairs during operation that could put the safety of maintenance personnel of the public at risk, should be avoided.

F. Equipment alterations

Alterations to parts of a piece of equipment or structure that could affect the essential safety of the equipment should only be carried out 

after consultation with the manufacturer or a compete person.

Summary of Contents for IGLOO NET Sphere M

Page 1: ...ntents 1 Removing the reticulated system Check of removing condition each rope Screwing the turn buckle and conversion the turnbuckle in anchors plate see for this workstep turnbuckle assembly 2 Abras...

Page 2: ...8 2 48m Use zone L 23 3 1 2 7 1m EN W 23 3 1 2 7 1m Completed Net Features The series is a steel framed climbing structure made of steel loaded Nylon cables and comes protected against UV The Sphere...

Page 3: ...d Fall Height zone Fall Height and safety area Safety area The requirements for space and safety clearances are taken from BS EN 1176 1 ASTM F1487 CSA Z614 The use zone for stationary play equipment s...

Page 4: ...m Tel 82 0 55 326 9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do 50802 Republic of Korea IGLOO NET MODEL NO Rev_0 2018 04 Sphere M 4 Post Plate Assem...

Page 5: ...n is completed If the stickers are detached during the installation it might be difficult to check whether the parts are correctly assembled in correct order and position Quite much recommended to tak...

Page 6: ...til the installation is completed If the stickers are detached during the installation it might be difficult to check whether the parts are correctly assembled in correct order and position Quite much...

Page 7: ...55 326 9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do 50802 Republic of Korea IGLOO NET MODEL NO Rev_0 2018 04 Sphere M 7 Overall Assembly Overall As...

Page 8: ...imhae si Gyeongsangnam do 50802 Republic of Korea IGLOO NET MODEL NO Rev_0 2018 04 Sphere M 8 Overall Assembly Net Assembly In case of Ball 1 2 Cover up the cap with Shackle connector and Bolt 1 Check...

Page 9: ...n Gimhae si Gyeongsangnam do 50802 Republic of Korea IGLOO NET MODEL NO Rev_0 2018 04 Sphere M 9 Overall Assembly Net Assembly In case of Ball 2 Cover up the cap with Shackle connector and Bolt Check...

Page 10: ...also recommended that subsequent checks on tension should be carried out at monthly intervals and adjusted as required This will increase the overall longevity of the product Checking 1 month Refer to...

Page 11: ...Rev_0 2018 04 Sphere M 11 PARTS LIST No A Net Parts check list A Net 1 Ball Connector 1 2 Ball Connector 2 3 Pipe 1 9EA 4 Pipe 2 3EA 21 Post Plate 41 Set Anchor 61 Shackle Connector 62 Ball Connector...

Page 12: ...wn to local regulations B Procedures Defects that occur during operation and which put safety at risk should be corrected without delay If this is not possible the equipment should be secured against...

Page 13: ...ch measures should include a tightening of fastenings b re painting and re treatment of surfaces c maintenance of any impact attenuating surfaces d lubrication of bearings e marking of equipment to si...

Reviews: