GSWeb Playground Equipment IGLOO NET Sphere M Installation Manual Download Page 12

GSWeb Playground Equipment

E-mail) [email protected]

Website) www.gswebplay.com

Tel) +82 (0)55 326 9025

Fax) +82 (0)55 326 9026

65, Saengnim-daero 259beon-gil, Saengnim-Myeon

Gimhae-si, Gyeongsangnam-do, 50802, Republic of Korea

IGLOO NET

MODEL NO.

Rev_0

2018.04.

Sphere M

12

Maintenance

A. General safety measures

On the playground there should be a sign(pictogram) giving the following information:

a) general emergency telephone number;

b) telephone number to contact maintenance personnel;

c) name of the playground;

d) address of playground; and

e) other relevant local information, if applicable.

The entry, exit and emergency paths to and from a playground, intended for use by the public and emergency services, should be accessible 

and free of obstacles at all times.

NOTE  Attention is drawn to local regulations.

B. Procedures

Defects that occur during operation and which put safety at risk should be corrected without delay. If this is not possible, the equipment 

should be secured against use e.g. by immobilization or removal.

There should be written operational procedures covering the measures to be taken in the event of accidents, fire and the like.

Until unsafe equipment is repaired and released for use, access by the public should be prevented. Information about accidents brought to 

the attention of the manager should be recorded on a form that includes the following details:

a) date and tie of accident;

b) age and sex of victim and clothing worn, Including footwear;

c) equipment involved;

d) number of children on site at the time of the accident;

e) description of accident;

f) injury sustained including part(s) of body affected;

g) action taken;

h) witness statements;

i) any subsequent equipment modification;

j) weather conditions; and

k) any other relevant information.

Summary of Contents for IGLOO NET Sphere M

Page 1: ...ntents 1 Removing the reticulated system Check of removing condition each rope Screwing the turn buckle and conversion the turnbuckle in anchors plate see for this workstep turnbuckle assembly 2 Abras...

Page 2: ...8 2 48m Use zone L 23 3 1 2 7 1m EN W 23 3 1 2 7 1m Completed Net Features The series is a steel framed climbing structure made of steel loaded Nylon cables and comes protected against UV The Sphere...

Page 3: ...d Fall Height zone Fall Height and safety area Safety area The requirements for space and safety clearances are taken from BS EN 1176 1 ASTM F1487 CSA Z614 The use zone for stationary play equipment s...

Page 4: ...m Tel 82 0 55 326 9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do 50802 Republic of Korea IGLOO NET MODEL NO Rev_0 2018 04 Sphere M 4 Post Plate Assem...

Page 5: ...n is completed If the stickers are detached during the installation it might be difficult to check whether the parts are correctly assembled in correct order and position Quite much recommended to tak...

Page 6: ...til the installation is completed If the stickers are detached during the installation it might be difficult to check whether the parts are correctly assembled in correct order and position Quite much...

Page 7: ...55 326 9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do 50802 Republic of Korea IGLOO NET MODEL NO Rev_0 2018 04 Sphere M 7 Overall Assembly Overall As...

Page 8: ...imhae si Gyeongsangnam do 50802 Republic of Korea IGLOO NET MODEL NO Rev_0 2018 04 Sphere M 8 Overall Assembly Net Assembly In case of Ball 1 2 Cover up the cap with Shackle connector and Bolt 1 Check...

Page 9: ...n Gimhae si Gyeongsangnam do 50802 Republic of Korea IGLOO NET MODEL NO Rev_0 2018 04 Sphere M 9 Overall Assembly Net Assembly In case of Ball 2 Cover up the cap with Shackle connector and Bolt Check...

Page 10: ...also recommended that subsequent checks on tension should be carried out at monthly intervals and adjusted as required This will increase the overall longevity of the product Checking 1 month Refer to...

Page 11: ...Rev_0 2018 04 Sphere M 11 PARTS LIST No A Net Parts check list A Net 1 Ball Connector 1 2 Ball Connector 2 3 Pipe 1 9EA 4 Pipe 2 3EA 21 Post Plate 41 Set Anchor 61 Shackle Connector 62 Ball Connector...

Page 12: ...wn to local regulations B Procedures Defects that occur during operation and which put safety at risk should be corrected without delay If this is not possible the equipment should be secured against...

Page 13: ...ch measures should include a tightening of fastenings b re painting and re treatment of surfaces c maintenance of any impact attenuating surfaces d lubrication of bearings e marking of equipment to si...

Reviews: