GSWeb Playground Equipment IGLOO NET Sphere M Installation Manual Download Page 1

GSWeb Playground Equipment

E-mail) [email protected]

Website) www.gswebplay.com

Tel) +82 (0)55 326 9025

Fax) +82 (0)55 326 9026

65, Saengnim-daero 259beon-gil, Saengnim-Myeon

Gimhae-si, Gyeongsangnam-do, 50802, Republic of Korea

IGLOO NET

MODEL NO.

Rev_0

2018.04.

Sphere M

1

INSTALLATION MANUAL

Safety Checklist after first assembly

Test intervals of  Safety: 6 months

Test Component and contents:

1. Removing the reticulated system:

- Check of removing condition each rope

- Screwing the turn buckle and conversion the turnbuckle

in anchors plate(see for this workstep turnbuckle assembly)

2. Abrasion condition of rope:

- Checking of all rope surface

- Strengthened of rope: Coating on the surface

3. Attachment condition of the anchors plate and turnbuckle

4. Screwing condition of all bolt

5. Galvanizing condition of  the steel component:

- Protection of steel component from corrosion.

Measure

In case of the appearance the defect detail is 

repaired usually within 3 days after checking.

Summary of Contents for IGLOO NET Sphere M

Page 1: ...ntents 1 Removing the reticulated system Check of removing condition each rope Screwing the turn buckle and conversion the turnbuckle in anchors plate see for this workstep turnbuckle assembly 2 Abras...

Page 2: ...8 2 48m Use zone L 23 3 1 2 7 1m EN W 23 3 1 2 7 1m Completed Net Features The series is a steel framed climbing structure made of steel loaded Nylon cables and comes protected against UV The Sphere...

Page 3: ...d Fall Height zone Fall Height and safety area Safety area The requirements for space and safety clearances are taken from BS EN 1176 1 ASTM F1487 CSA Z614 The use zone for stationary play equipment s...

Page 4: ...m Tel 82 0 55 326 9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do 50802 Republic of Korea IGLOO NET MODEL NO Rev_0 2018 04 Sphere M 4 Post Plate Assem...

Page 5: ...n is completed If the stickers are detached during the installation it might be difficult to check whether the parts are correctly assembled in correct order and position Quite much recommended to tak...

Page 6: ...til the installation is completed If the stickers are detached during the installation it might be difficult to check whether the parts are correctly assembled in correct order and position Quite much...

Page 7: ...55 326 9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do 50802 Republic of Korea IGLOO NET MODEL NO Rev_0 2018 04 Sphere M 7 Overall Assembly Overall As...

Page 8: ...imhae si Gyeongsangnam do 50802 Republic of Korea IGLOO NET MODEL NO Rev_0 2018 04 Sphere M 8 Overall Assembly Net Assembly In case of Ball 1 2 Cover up the cap with Shackle connector and Bolt 1 Check...

Page 9: ...n Gimhae si Gyeongsangnam do 50802 Republic of Korea IGLOO NET MODEL NO Rev_0 2018 04 Sphere M 9 Overall Assembly Net Assembly In case of Ball 2 Cover up the cap with Shackle connector and Bolt Check...

Page 10: ...also recommended that subsequent checks on tension should be carried out at monthly intervals and adjusted as required This will increase the overall longevity of the product Checking 1 month Refer to...

Page 11: ...Rev_0 2018 04 Sphere M 11 PARTS LIST No A Net Parts check list A Net 1 Ball Connector 1 2 Ball Connector 2 3 Pipe 1 9EA 4 Pipe 2 3EA 21 Post Plate 41 Set Anchor 61 Shackle Connector 62 Ball Connector...

Page 12: ...wn to local regulations B Procedures Defects that occur during operation and which put safety at risk should be corrected without delay If this is not possible the equipment should be secured against...

Page 13: ...ch measures should include a tightening of fastenings b re painting and re treatment of surfaces c maintenance of any impact attenuating surfaces d lubrication of bearings e marking of equipment to si...

Reviews: