![GSWeb Playground Equipment GS-W2003 Installation Manual Download Page 7](http://html1.mh-extra.com/html/gsweb-playground-equipment/gs-w2003/gs-w2003_installation-manual_2275802007.webp)
7
DOUBLE MAST NET CLIMBER
MODEL NO.
GS-W2003
Concrete Footings
Figure-7:
Concrete footing work
[Concrete]
Pour concrete* into wooden support frame until flush to top edge
Allow 3-5 days for concrete to cure before proceeding to next step.
*Concrete to be wet concrete with minimum 25 MPa / 3500 PSI.
[concrete footing work]
Pour wet concrete in the wooden support frame