GSWeb Playground Equipment GS-W2003 Installation Manual Download Page 19

19

DOUBLE MAST NET CLIMBER

MODEL NO.

GS-W2003

19

Maintenance

A. General safety measures

On the playground there should be a sign(pictogram) giving the following information:
a) general emergency telephone number;
b) telephone number to contact maintenance personnel;
c) name of the playground;
d) address of playground; and
e) other relevant local information, if applicable.
The entry, exit and emergency paths to and from a playground, intended for use by the public and emergency services, should be accessible and 
free of obstacles at all times.

NOTE  Attention is drawn to local regulations.

B. Procedures

Defects that occur during operation and which put safety at risk should be corrected without delay. If this is not possible, the equipment should 
be secured against use e.g. by immobilization or removal.
There should be written operational procedures covering the measures to be taken in the event of accidents, fire and the like.
Until unsafe equipment is repaired and released for use, access by the public should be prevented. Information about accidents brought to the 
attention of the manager should be recorded on a form that includes the following details:
a) date and tie of accident;
b) age and sex of victim and clothing worn, Including footwear;
c) equipment involved;
d) number of children on site at the time of the accident;
e) description of accident;
f) injury sustained including part(s) of body affected;
g) action taken;
h) witness statements;
i) any subsequent equipment modification;
j) weather conditions; and
k) any other relevant information.

Summary of Contents for GS-W2003

Page 1: ...on of rope Checking of all rope surface Strengthned of rope Coating on the surface 3 Attachment condition of the anchors plate and turnbuckle 4 Screwing condition of all bolt 5 Galvanizing condition o...

Page 2: ...highest steel content and the strongest connection materials in the industry including a steel wire core in our edge ropes and connection points crushed in place with over 75 tons of pressure to ensur...

Page 3: ...mm from all sides of the play structure Fall Height a 6 3 1900mm Height from surface The Fall height on the external surface of a pyramid shaped space net is the highest point attainable within a hori...

Page 4: ...12 300mm P2 Depth of concrete footing 31 800mm P1 Depth below Finished Grade 12 300mm P2 Depth of concrete footing 31 800mm Figure 4 Foundation section view Figure 3 Excavate enough material for prop...

Page 5: ...Position anchor plate on concrete footing CF L anchor hole Front edge of anchor plate must be installed 4 100mm from the edge of concrete footing 4 4 Metric Imperial conversion 7000mm 22 11 1 2 8600m...

Page 6: ...00mm W x 2 3 700mm H 3 frames 3 11 1200mm L x 3 3 1000mm W x 2 11 900mm H 3 frames 2 3 700mm L x 2 3 700mm W x 2 7 800mm H 1 frames 2 7 800mm L x 2 7 800mm W x 2 11 900mm H Use min plywood not include...

Page 7: ...footing work Concrete Pour concrete into wooden support frame until flush to top edge Allow 3 5 days for concrete to cure before proceeding to next step Concrete to be wet concrete with minimum 25 MP...

Page 8: ...2003 Remove Wood Support Frame Figure 8 Remove support frames Remove wood support frame from dry concrete blocks After concrete has cured enough remove frames and replace soil around footings to subgr...

Page 9: ...Assembly c Connector plate Figure 10 Attach Anchor plate to footing with flat washer locking washer and nut Figure 9 Concreted blocks Clean threads of L Anchors b Post plate a Anchor Plate c Connector...

Page 10: ...ODEL NO GS W2003 STEP 1 Figure 11 Find Nylon String STEP 2 Figure 12 Insert Post following Nylon string Nylon string Post Assembly Insert Post following nylon string NOTE Remove string prior to placin...

Page 11: ...13 Insert Post into the Center of Net Place Cap on Post Thread the mast through the net s center per diagrams below or following factory installed guide string Press the cap already attached to the t...

Page 12: ...fety Cable Attaching Attach safety cable to anchor plates A B as shown in Figure 16 M22 X L110 H T BOLT Figure 17 Safety cable Assembly After successfully preparing the net and mast assembly attach sa...

Page 13: ...MBER MODEL NO GS W2003 Figure 18 Centre Post Figure 19 Safety cable attached It is strongly recommended that 5 7 workers or a machine lift the net into place A A B B D D A B C D C C Working Process Pl...

Page 14: ...003 After standing up the Net Attach remaining safety rope and Turnbuckles A B C D A A B B C C D D E Figure 21 Loosen Turnbuckle all the way about 100mm leaving only 4 or 5 threads attached E Figure 2...

Page 15: ...with Turnbuckle Figure 23 Turnbuckle assembly M22 X L110 H T BOLT a b b b b a Attaching Turnbuckle to Anchor Plates NOTE Make sure posts are straight side to side and lean slightly towards the ends b...

Page 16: ...e carried out at monthly intervals and adjusted as required This will increase the overall longevity of the product Checking 1 month Refer to IPEMA and TUV maintance system After Net structure tension...

Page 17: ...6 1 1 2 8 3 1 main post 7 5M 1 1 main post 7 5M 2 multi compound rope 3 post cap 4 turn buckle 5 anchor shackle 6 shock proof ring 7 H T bolt nut washer 8 U bolt nut washer 9 main post plate 10 L anc...

Page 18: ...CLIMBER MODEL NO GS W2003 A weekly check of the activity net is recommended to ensure that no acts of vandalism have damaged the rope Periodic checks on tension will assist in the durability of the p...

Page 19: ...be corrected without delay If this is not possible the equipment should be secured against use e g by immobilization or removal There should be written operational procedures covering the measures to...

Page 20: ...e of any impact attenuating surfaces d lubrication of bearings e markig of equipment to signify loose fill finished surface level f cleaning g removal of broken glass and other debris or contaminants...

Reviews: