SINGLE MAST NET CLIMBER
MODEL NO.
GS-W1001
GSWeb Playground Equipment
7
Figure-7:
Concrete footing work
[Concrete]
Pour concrete* into wooden support frame until flush to top edge
Allow 3-5 days for concrete to cure before proceeding to next step.
*Concrete is to be wet concrete with minimum 25 MPA / 3500PSI.
[concrete footing work]
Pour
wet concrete in the wooden support frame
Concrete Footing