Maintenance

C. Routine maintenance

To reduce accidents, the owner or operator should ensure that an appropriate routine maintenance schedule is established, implemented and 

maintained. This should take into account local conditions and the manufacturer's instructions that can affect the necessary inspection 

frequency. The schedule should list the components to be maintained and should also give procedures for dealing with complaints and 

breakdowns.

The routine maintenance of playground equipment and surfaces should consist of preventative measures to maintain their level of safety, 

performance and compliance with the relevant part(s) of EN 1176. Such measures should include:

a) tightening of fastenings;

b) re-painting and re-treatment of surfaces;

c) maintenance of any impact attenuating surfaces;

d) lubrication of bearings;

e) marking of equipment to signify loose fill finished surface level;

f) cleaning;

g) removal of broken glass and other debris or contaminants;

h) restoring loose fills to the correct level; and

i) maintenance of free space areas.

D. Corrective maintenance

Corrective maintenance should include measures to correct defects, or th re-establish the necessary levels of safety of the playground 

equipment and surfaces. Such measures should include:

a) replacement of fastenings;

b) welding of welding repairs;

c) replacement of worn or defective parts; and

d) replacement of defective structural components.

E. Personal safety

Repairs during operation that could put the safety of maintenance personnel of the public at risk, should be avoided.

F. Equipment alterations

Alterations to parts of a piece of equipment or structure that could affect the essential safety of the equipment should only be carried out 

after consultation with the manufacturer or a compete person.

Summary of Contents for GS-RH115

Page 1: ...ed Net Features The Rolling Hills features GS Web Technology which includes the highest steel content and the strongest connection materials in the industry including a steel wire core in our edge ropes and connection points crushed in place with over 75 tons of pressure to ensure long life of the games and maximum safety for the children GS Web Nets help bring movement balance exercise and fun ba...

Page 2: ...requirements for space and safety clearances are taken from BS EN 1176 1 ASTM F1487 The use zone for stationary play equipment shall extend no less than 72 in 1830mm from all sides of the play structure Fall Height 2010mm from surface The Fall height on the external surface of a pyramid shaped space net is the highest point attainable on the edge of the structure where an unimpeded fall to the pro...

Page 3: ...ease refer to following details for foundation work Base plates are welded to the Rolling Hill s pipe After assembling pipes and nets fix the structure on the concrete Foundation Detail Foundation Pouring Concrete Pour concrete into wooden support frame until flush to top edge Allow 3 5 days for concrete to cure before proceeding to next step Concrete is to be wet concrete with minimum 25 MPA 3500...

Page 4: ...nstallation is completed If the stickers are detached during the installation it might be difficult to check whether the parts are correctly assembled in correct order and position Quite much recommended to take care that no sticker is detached before installation is completely finished The information on stickers is made up of part name and number such as O F 1 I P 1 etc Overall Assembly Assemble...

Page 5: ...epublic of Korea ROLLING HILLS MODEL NO GS RH115 Rev_0 2018 04 5 OVERALL ASSEMBLY PIPE Overall Assembly Assemble the pipes in alphabetical order 1 Check the pipes numbers on Stickers on them 2 As below picture Line up the pipes and Connect the pipe to the next pipe 3 Set the holes on the pipe and put bolts into the holes 4 Fasten the bolts 5 Repeat with the others in the same way No 101 Bolt set 2...

Page 6: ... Myeon Gimhae si Gyeongsangnam do 50802 Republic of Korea ROLLING HILLS MODEL NO GS RH115 Rev_0 2018 04 6 OVERALL ASSEMBLY NET Overall Assembly Assemble the parts in the following order 1 Check the net s name There are 6 set net from Net A 2 Attach the net to the proper location of pipe in order as below picture Fix Bolt M6 x L15 Frame Frame Fix Nut M6 x L15 Net A ...

Page 7: ...drawn to local regulations B Procedures Defects that occur during operation and which put safety at risk should be corrected without delay If this is not possible the equipment should be secured against use e g by immobilization or removal There should be written operational procedures covering the measures to be taken in the event of accidents fire and the like Until unsafe equipment is repaired ...

Page 8: ...Such measures should include a tightening of fastenings b re painting and re treatment of surfaces c maintenance of any impact attenuating surfaces d lubrication of bearings e marking of equipment to signify loose fill finished surface level f cleaning g removal of broken glass and other debris or contaminants h restoring loose fills to the correct level and i maintenance of free space areas D Cor...

Reviews: