GSWeb Playground Equipment GS-RH115 Installation & Maintenance Instructions Manual Download Page 1

GSWeb Playground Equipment

E-mail) [email protected]

Website) www.gswebplay.com

Tel) +82 (0)55 326 9025

Fax) +82 (0)55 326 9026

65, Saengnim-daero 259beon-gil, Saengnim-Myeon

Gimhae-si, Gyeongsangnam-do, 50802, Republic of Korea

ROLLING HILLS

MODEL NO.

GS-RH115

Rev_0

2018.04

1

INSTALLATION & MAINTENANCE INSTRUCTIONS

Completed Net

Features

The Rolling Hills features GS Web Technology which includes 

the highest steel content and the strongest connection 

materials in the industry, including a steel-wire core 

in our edge ropes and connection points crushed in place with 

over 

75 tons 

of pressure to ensure long life of the games 

and maximum safety for the children.  

GS Web Nets help bring movement, balance, exercise and fun 

back into the playground.

Ages : 5 to 12 years

Capacity : 16 children

Size : L4.14m x W2.61m x H2.01m

Use zone : L7.81m x W5.61m

Summary of Contents for GS-RH115

Page 1: ...ed Net Features The Rolling Hills features GS Web Technology which includes the highest steel content and the strongest connection materials in the industry including a steel wire core in our edge ropes and connection points crushed in place with over 75 tons of pressure to ensure long life of the games and maximum safety for the children GS Web Nets help bring movement balance exercise and fun ba...

Page 2: ...requirements for space and safety clearances are taken from BS EN 1176 1 ASTM F1487 The use zone for stationary play equipment shall extend no less than 72 in 1830mm from all sides of the play structure Fall Height 2010mm from surface The Fall height on the external surface of a pyramid shaped space net is the highest point attainable on the edge of the structure where an unimpeded fall to the pro...

Page 3: ...ease refer to following details for foundation work Base plates are welded to the Rolling Hill s pipe After assembling pipes and nets fix the structure on the concrete Foundation Detail Foundation Pouring Concrete Pour concrete into wooden support frame until flush to top edge Allow 3 5 days for concrete to cure before proceeding to next step Concrete is to be wet concrete with minimum 25 MPA 3500...

Page 4: ...nstallation is completed If the stickers are detached during the installation it might be difficult to check whether the parts are correctly assembled in correct order and position Quite much recommended to take care that no sticker is detached before installation is completely finished The information on stickers is made up of part name and number such as O F 1 I P 1 etc Overall Assembly Assemble...

Page 5: ...epublic of Korea ROLLING HILLS MODEL NO GS RH115 Rev_0 2018 04 5 OVERALL ASSEMBLY PIPE Overall Assembly Assemble the pipes in alphabetical order 1 Check the pipes numbers on Stickers on them 2 As below picture Line up the pipes and Connect the pipe to the next pipe 3 Set the holes on the pipe and put bolts into the holes 4 Fasten the bolts 5 Repeat with the others in the same way No 101 Bolt set 2...

Page 6: ... Myeon Gimhae si Gyeongsangnam do 50802 Republic of Korea ROLLING HILLS MODEL NO GS RH115 Rev_0 2018 04 6 OVERALL ASSEMBLY NET Overall Assembly Assemble the parts in the following order 1 Check the net s name There are 6 set net from Net A 2 Attach the net to the proper location of pipe in order as below picture Fix Bolt M6 x L15 Frame Frame Fix Nut M6 x L15 Net A ...

Page 7: ...drawn to local regulations B Procedures Defects that occur during operation and which put safety at risk should be corrected without delay If this is not possible the equipment should be secured against use e g by immobilization or removal There should be written operational procedures covering the measures to be taken in the event of accidents fire and the like Until unsafe equipment is repaired ...

Page 8: ...Such measures should include a tightening of fastenings b re painting and re treatment of surfaces c maintenance of any impact attenuating surfaces d lubrication of bearings e marking of equipment to signify loose fill finished surface level f cleaning g removal of broken glass and other debris or contaminants h restoring loose fills to the correct level and i maintenance of free space areas D Cor...

Reviews: