GSSIM Mini Scaffolding Assembly & Operating Instructions
4
STEP 3
Install “Platform C” on side braces B so that platform is fully seated within inner channel on top of side braces.
STEP 4
Rotate the platform clips into the engaged position. (See Figure D)
STEP 5
Install 4 casters (D) into legs of frames with 4 Connector Pins (F) (See Figure E)
STEP 6
Remaining 4 Connector Pins must be inserted fully in holes on frame.
(FIGURE G)
WARNING:
Be certain all eight Pins are fully inserted and locked intos holes.
(See Figure H)
WARNING:
•
RECHECK ALL SIDE BRACE LOCK PINS
AND ALL CONNECTOR PINS FOR FULL
ENGAGEMENT BEFORE ACCESSING
PLATFORM.
•
RECHECK PLATFORM TO BE SURE IT IS
PROPERLY SEATED WITHIN SIDE BRACE
CHANNEL AND THE PLATFORM CLIPS ARE
FULLY ENGAGED.
•
WHEN ACCESSING PLATFORM, CLIMB
OVER TOP OF FRAME LADDER.
•
DO NOT SWING AROUND SIDE OF FRAME.
•
REMOVE THE PLATFORM BEFORE
ADJUSTING THE DECK LEVEL.
TYPICAL APPLICATIONS INCLUDE:
•
Painting
•
Overhead Door Installation
•
Acoustical/Ceilings
•
Lighting and wire Maintenance & Electrical
•
Drywall installation & taping
•
General Building Maintenance
•
Window Cleaning & Treatment Installation
•
HVAC Installation
•
Sign Installation and Maintenance
•
Shelving
Figure D
8 Connector Pins (F)
Figure G
Figure E
Figure H