background image

GSSIM Mini Scaffolding Assembly & Operating Instructions 

Figure B

 

Figu 

 

Figure C

 

Figure C

 

 

ASSEMBLY INSTRUCTION

 

For proper assembly, the Mini Scaffold must be comprised of these individual parts. (See Figure A) 

 

Item 

Part Name 

Qty 

Frame 

Side Brace 

Platform 

Caster 

Lock Pin 

Connector Pin 

 

 
 

 
 
 
 
 
 
 
 
 
 
 

 

 
 
 

 

 

 
 

 
 
 
 
STEP 1 

Attach side brace B to two frames A: 

  Pull L-shape lock pin at each end of side brace to the 

disengaged position. (Figure B) 

  While holding L-shape pin in disengaged position, 

place U-channel on each end of side brace B around 
leg of frame A at desired platform height. 

  Release lock pin and be sure that pin fully engages 

into hole in frame A leg. 

 

 

Pin Is Disengaged (Unlocked Position) 

 
 

 

Pin Is Fully Engaged (Locked Position) 

                        

 

STEP 2 

Attach second side brace B to both frames A (REPEAT INSTRUCTIONS IN STEP 1). 
 

All four L-shaped lock pins must be inserted fully in holes on frame. (FIGURE C) 
WARNING: 

Be certain Pin is fully inserted into hole (Figure B). Do not leave the Pin half-inserted. 

 

 
WARNING: 

 

BOTH SIDE BRACES MUST BE POSITIONED AT THE SAME HEIGHT ON THE FRAMES SO THAT THE 
PLATFORM WILL BE LEVEL. 

 

BE SURE ALL 4 L-SHAPE LOCK PINS ARE FULLY ENGAGED IN HOLES OF FRAMES.

 

 

REMOVE THE PLATFORM BEFORE ADJUSTING THE DECK LEVEL. 

 

Figure C

 

Summary of Contents for Mini Scaffold

Page 1: ...de to ensure the accuracy of this manual We reserve the right to change this product at any time without prior notice STOP DO NOT RETURN THIS PRODUCT TO THE RETAILER Questions Problems CONTACT CUSTOMER SERVICE If you experience a problem or need parts for this product visit our website http www buffalotools com or call our customer help line at 1 636 532 9888 Monday Friday 8 AM 4 PM Central Time A...

Page 2: ...ath Erectors dismantlers and users of Multi Use Scaffold must read and fully understand these Safety Rules and Instructions MAXIMUM LOAD CAPACITY 500 Lbs Workers Materials DO NOT OVERLOAD SCAFFOLD IT MAY RESULT IN SERIOUS INJURY DO NOT STACK MORE THAN TWO UNITS HIGH OUTRIGGERS REQUIRED WHEN STACKING SPECIFICATIONS Assembled Product Dimension 46 45 H x 43 L x 21 D Platform Dimension 40 x 21 25 Adju...

Page 3: ...of side brace B around leg of frame A at desired platform height Release lock pin and be sure that pin fully engages into hole in frame A leg Pin Is Disengaged Unlocked Position Pin Is Fully Engaged Locked Position STEP 2 Attach second side brace B to both frames A REPEAT INSTRUCTIONS IN STEP 1 All four L shaped lock pins must be inserted fully in holes on frame FIGURE C WARNING Be certain Pin is ...

Page 4: ... WARNING RECHECK ALL SIDE BRACE LOCK PINS AND ALL CONNECTOR PINS FOR FULL ENGAGEMENT BEFORE ACCESSING PLATFORM RECHECK PLATFORM TO BE SURE IT IS PROPERLY SEATED WITHIN SIDE BRACE CHANNEL AND THE PLATFORM CLIPS ARE FULLY ENGAGED WHEN ACCESSING PLATFORM CLIMB OVER TOP OF FRAME LADDER DO NOT SWING AROUND SIDE OF FRAME REMOVE THE PLATFORM BEFORE ADJUSTING THE DECK LEVEL TYPICAL APPLICATIONS INCLUDE Pa...

Page 5: ...OUS INJURY OR DEATH MAY RESULT FROM IMPROPER ERECTION OR USE of scaffolding equipment Erectors and users must be familiar with and follow safe practice and the Safety Rules contained herein These Safety Rules cover generalized situations only and should not be used to replace any other additional safety and precautionary measures that may be necessary to cover the many usual or unusual conditions ...

Page 6: ...tability and safety of the scaffold Assure that the structure to which the scaffold is tied or anchored is capable of safely supporting all loads imposed by the scaffold L FREE STANDING SCAFFOLDS other than wall scaffolds must be restrained from tipping by guying or other means recognizing that stability is essential to the safety of the scaffold M NEVER USE LADDERS OR MAKESHIFT DEVICES on top of ...

Page 7: ... equipment before using Never use any equipment that is damaged or defective in any way Mark it or tag it as defective Remove it from the job site E Scaffolds must be erected in accordance with design and or manufacturer s recommendations F Do not erect dismantle or alter a scaffold unless under the supervision of a competent person G Do not abuse or misuse the scaffold equipment H Erected scaffol...

Page 8: ...ated veneer lumber or fabricated scaffold planks and platforms unless cleated or restrained shall extend over their end supports not less thank 6 nor more than 18 This overhang should be guardrailed to prevent access M For Putlogs and Trusses the following additional guidelines apply 1 Do not cantilever or extend putlogs trusses as side brackets without thorough consideration of loads to be applie...

Reviews: