- 41 -
PTIM 1000
6
f
inal
ProCedures
After installing the head-end station, upgrading accessories or installing cas-
settes it is necessary to tighten all cable connections, cable terminals and cover
screws in order to maintain compliance with current EMC regulations securely.
• Securely tighten the cable bolted connections fingertight using an appropri-
ate open-ended spanner.
• Mount the front cover (see assembly instructions of the head-end station).