Page 4 of 8
1700W Solar Battery Charger
Maximum Power Point Tracker
Operating Instructions
Please read these instructions before use
Unit 2, 110 Station Road, Seven Hills ,NSW, 2147, Australia
Model:
MPPT30-2L
Wiring With Critical And Non Critical Loads (Figure 3):
Critical loads are generally light loads which are powered under any condition. Non critical loads
are loads which can be disconnected to ensure maximum on time for critical loads as well as to
extend the life expectancy and reliability of the system. The non critical load can be set up as Dawn
to Dusk loads (via MCM).
Wiring with MCM option:
Connecting the optional MCM to the MPPT will allow various system parameter display, output
voltage and alarm settings and enable the programmable dawn to dusk or remote load control
options.
For more details please refer to MCM Manual.
MPPT30-2L-R3
Wiring With Over Voltage Disconnect (Figure 2) :
This option protects the Load from receiving a High Voltage. The MPPT voltage goes over 1V above its maximum
programed value.This protects the load from overvoltage spikes such as disconnection of the battery, or faults with in
the system. Most LiFePo
4
are fitted with over voltage disconnects from their onboard charge controllers and are already
protected against Over Voltage.
Panel +
Panel -
Disconnect
ed
Connect
ed
MIHV Remote LED
MIHV
MPPT
Load -