background image

Page 7 of 8

Model:

MPPT10HV

Unit 2, 110 Station Road, Seven Hills ,NSW,  2147, Australia

400W Solar Charger

Maximum Power Point Tracker

Operating Instructions

Please read these instructions before use

Wiring The Remote Alarm:

The remote alarm is a normally low, 5V digital signal that goes high when the battery voltage drops below 
0.9 of nominal voltage, the LVD disconnects or over temperature trips. It has a 5mA source capability and 
can be used to remotely monitor system status.

Wiring With Load Remote Control:

This option enables the remote load connection and disconnection via the load remote control, 

GREY wire. When the GREY wire is grounded the load is disconnected otherwise the load is 
connected. To configure this mode the ORANGE wire must be grounded. This option overrides the 

LVD or DDS function but has the same load limitations of 10A continuous or 20A transient.

Grey

LOAD

Orange

Blue

MPPT10HV R3

Buzzer, LED

PC I/O 5V 5mA

+

-

Yellow

Green

Please ensure that your MPPT has been correctly configured for your application. Refer 

to the Settings and Configurations section for more information. 

Green

Summary of Contents for MPPT10HV

Page 1: ...novation award A simple compact and low cost alternative Ideal for charging batteries with the new low cost high efficiency grid type panels MPPT10HV Unit MPPT10HV Specifications Efficiency Typical 96 Input Voltage 15V to 90V Float Voltage Maintanence Lead Acid 13 5V 27V 54V LiFePO4 14V 28V 56V Charge Voltage 14 6V 29 2V 58 4V Max Panel Power 400W on 48V Battery 200W on 24V Battery 150W on 12V Bat...

Page 2: ...e instructions before use MPPT10HV R3 Unit 2 110 Station Road Seven Hills NSW 2147 Australia MPPT10HV General Information Green LED ON Battery Charged FLASHING Battery Charging OFF Fault If the LED is OFF the Over Voltage protection has tripped This protection disconnects the load and battery from the panel It is latched and will only be reset at dawn or when the panels are disconnected This MPPT ...

Page 3: ...ed with a combination of the ORANGE and GREY wires and the Rear Switch Always ensure that the Rear Switch is set for the Correct Battery Type The ORANGE and GREY wires should either be left floating ensure they are insulated from any other point or connected to the GREEN wire only Do not connect them to any other source or point To set the correct mode for the Load Wire for your application Follow...

Page 4: ...ion is intended to power up loads during night time only This feature will not trigger during short periods of low light it is an approximation only to actual ambient light levels and if precise ambient light levels are required then light sensors must be used The maximum DDS load current is 10A continuous or 20A transients The DDS is set to approx All Night actual night duration and up to 15 hour...

Page 5: ...ts the load when the battery voltage drops below 0 85 of nominal voltage to protect the battery from damage The load reconnects when the battery voltage exceeds 0 9 of nominal voltage This feature will not trigger during short transients LVD load is 10A continuous or 20A transient Blue Please ensure that your MPPT has been correctly configured for your application Refer to the Settings and Configu...

Page 6: ...y condition Non critical loads are loads which can be disconnected to ensure maximum on time for critical loads as well as to extend the life expectancy and reliability of the system The non critical load can be set up as LVD DD all night configuration using the ORANGE and GREY Wires detailed earlier Blue Critical Load Non Critical Load Please ensure that your MPPT has been correctly configured fo...

Page 7: ...tely monitor system status Wiring With Load Remote Control This option enables the remote load connection and disconnection via the load remote control GREY wire When the GREY wire is grounded the load is disconnected otherwise the load is connected To configure this mode the ORANGE wire must be grounded This option overrides the LVD or DDS function but has the same load limitations of 10A continu...

Page 8: ...and 150W panel is approximately 12A so you can expect about 40AH per day which is a 40W load for about 10 hours 2 The maximum bulk charge current with a 24V battery and a 200W panel is about 8A so you can expect about 30AH which is a 40W load for about 15 hours Q Why are MPPT used mainly in high power systems Until now and despite their overwhelming advantages MPPTs have been excluded from low pow...

Reviews: