Page 5 of 8
Model:
BMPPT-150
Unit 2, 110 Station Road, Seven Hills ,NSW, 2147, Australia
150W Solar Charger
Booster Maximum Power Point Tracker
Operating Instructions
Please read these instructions before use
Wiring With Low Voltage Disconnect :
The LVD option disconnects the load when the battery voltage drops below 0.85 of nominal
voltage to protect the battery from damage. The load reconnects when the battery voltage exceeds
0.9 of nominal voltage. This feature will not trigger during short transients. LVD load is 10A continuous
or 20A transient.
Grey
Please ensure that your BMPPT has been correctly configured (REN & CHE settings) for
your application. Refer to the Settings and Configurations section for more information.
+
BMPPT-150-R4