10.Repeat the previous steps to assemble the remaining strut (2), gusset plates (5) and diagonal
braces (6) to complete the 4-leg tower section.
Figure 5-5
Chevron bracing – middle side connections
1
Weld Column
4
Nut
2
Strut
5
Gusset Plate
3
Bolt
6
Diagonal Tube
11.If the section has only 1-bay (10 ft or shorter), ignore the above step (step-10) for assembly.