Assembling the 2-Leg Tower Section (Warren Bracing)
The following assembly procedure can be used for any section with 4-bays of warren bracing. A similar
procedure can be used for assembling the different sizes of warren braced 2-leg tower sections.
What You Should Know
Assemble the braces starting from the top working towards the bottom. Square the tower section and
tighten all hardware before stacking.
1. Insert the strut (2) between the shear plates located at the top of the columns (1) and connect them
using bolts (3) and nuts (4).
Figure 4-4
Assembling the top strut
1
Weld Column
3
Bolt
2
Strut
4
Nut