
PNEG-1583
10" Commercial Replacement Drive Kit
11
4. Installation
Prepare the Powerhead
1. Disconnect and lock out all power to the 10'' commercial double-drive vertical unload auger.
2. After the power has been disconnected and locked out, remove the existing belt guard assembly
on the horizontal drive.
a. Open the existing belt guard.
b. Relieve tension on the drive belts by adjusting the motor mount assembly.
c. Remove the drive belts.
d. Remove the motor pulley and drive sheave.
e. Unbolt and remove the existing belt guard assembly.
3. Remove the horizontal drive motor from the powerhead.
4. After the motor has been removed, loosen and remove the 3/4'' hex nut underneath the motor
mount sides, holding down the motor mount assembly.
Figure 4A
A main power disconnect switch capable of being locked only in the OFF
position should be used. The switch should be locked out whenever work is
being done on the powerhead.