8. Installation
46
PNEG-1276
Top Dry Autoflow Construction Manual 24', 30' and 36'
36' Leveling Band Post Installation
Install the leveling band posts on the floor as shown in
.
The third, sixth, tenth and twelfth holes in the floor sheets indicate the location of the leveling band posts.
Attach with 5/16" x 1-1/4" bin bolts (S-277). In the third hole from the bottom of the floor sheets there will
be eighteen (18) posts (one in every other sheet). In the sixth and tenth hole there will be twelve (12) posts
(1 at every third sheet). In the twelfth hole there will be six (6) posts (1 every sixth sheet).
Figure 8O
Leveling Band Installation
NOTE:
Field cut rounded notches in the outer leveling band(s) where the two (2) roof support channels
hang from the roof ribs.
Figure 8P