Once  installation  of  the  operator  has  been  completed,  make  a  careful  functional  check  of  all  accessories  and  safety  devices 
connected.
Give  the  Client  the  “User  Guide”  and  demonstrate  the  correct  operation  and  use  of  the  gearmotor,  highlighting  the  potentially 
dangerous zones of the automated system.

4.3. AUTOMATISM SYSTEM TEST

6. RESTORING NORMAL OPERATION

To prevent an inadvertent boost could move the gate during the maneuver, turn off the power supply , before locking again the motor.
LEVER UNLOCK
1) Close the unlock lever.
2) Move the gate until the release system meshes.
3) Close the plastic fold and restore the power supply to the system

7. MAINTENANCE

Check the functional operation of the system at least every six months, especially the efficiency of the safety devices (including the 
operator thrust force) and the release devices.

7.1. OIL FILLING

Periodically check the amount of oil within the operator.
For medium-low frequency of use, an annual check is enough, for more intensive use it is recommended every 6 months.
To make filling, unscrew the cap and load until the level.

8. REPAIRS

For any repairs, contact Norton’s authorised Repair Centres.

5. MANUAL OPERATION

If it is necessary to manually actuate the gate due to lack of power or disruption of 
automation, you must act on the release as follows.
LEVER UNLOCK
1) Insert the key supplied in the plastic fold and open it.
2)Pull the lever unlock.
3)Open or close the gate manually.

Summary of Contents for MSC 800

Page 1: ...ileo Galilei s n Zona Ind le 90044 Carini PA vicino DHL tel 39 091 8816371 tel fax 39 091 8816505 e mail automatismi grupponortonsrl 191 it Automatismi per Aperture Manual for installation and mainten...

Page 2: ...here the presence of inflammable gas or fumes automated system is a serious danger to safety 20 The installer shall supply all information concerning 8 The mechanical parts must conform to the manual...

Page 3: ...essary to operate in the work range below the curve Important The curve is obtained at a temperature of 20 C Exposure to the direct sun rays can reduce use frequency down to 20 Calculation of use freq...

Page 4: ...nuts During this operation route the cables through the appropriate openings in the motor body 2 Adjust the height of the gearmotor and the distance from the gate referring to dimensions in Fig 6 Att...

Page 5: ...crew 6x20 mm with relative plate reinforcement 4 Move the gate manually checking if the rack is resting on the pinion and repeat the operations at point 2 5 Position another rack element end to end wi...

Page 6: ...r supply to the system 7 MAINTENANCE Check the functional operation of the system at least every six months especially the efficiency of the safety devices including the operator thrust force and the...