background image

 

 

- 5 - 

SID 162

 

If the loop-through output is not used it must be terminated using the terminator 
supplied. The DC power feed (max. 800 mA  ) is used for the power supply 
of the LNBs connected.

 

The SAT IF distributor SID 162 is designed exclusively for use in the head-end 
station.

o

ver view

E

A

B

D

C

F

9-12 dB

9-14 dB

8 dB

 

A

  LNB power connection 

D

 

Input 1

 

B

  Input 2 

E

 

Outputs of input 1

 

C

  Loop-through output of  

F

 

Outputs of input 2

 

 

input 1 with terminator

Summary of Contents for GSS SID 162

Page 1: ...Assembly Instruction SID 162 ...

Page 2: ...bols used 4 2 3 Technical data 4 2 4 Description 4 3 Overview 5 4 Installing the SAT IF input distributor 6 5 Connecting the SAT IF input distributor 7 5 1 Connecting the HF connections 7 Using one reception area loop through mode 7 Using two reception areas 7 5 2 Connecting the power supply 8 6 Final procedures 9 ...

Page 3: ...d for damage caused by faulty connections or inap propriate handling of the device Check the head end station according to the safety instructions listed in their assembly instruction Take precautions to prevent static discharge when working on the device Electronic devices should never be disposed of in the household rubbish In accordance with directive 2002 96 EC of the European Parliament and t...

Page 4: ...T IF outputs 6 4 F sockets Input output impedance 75 Ω Decoupling of the outputs 20 dB Loss 1 6 fold see page 5 9 14 dB Loop through loss 8 dB Loss 1 4 fold see page 5 9 12 dB LNB operating voltage supply via external connector max 800 mA 2 4 Description The SAT IF distributor SID 162 is equipped with two SAT IF inputs one loop through output and 10 SAT IF outputs This enables to distribute two re...

Page 5: ... 800 mA is used for the power supply of the LNBs connected The SAT IF distributor SID 162 is designed exclusively for use in the head end station 3 Over view E A B D C F 9 12 dB 9 14 dB 8 dB A LNB power connection D Input 1 B Input 2 E Outputs of input 1 C Loop through output of F Outputs of input 2 input 1 with terminator ...

Page 6: ... Remove the front cover and the base plate of the head end station Insert the SAT IF input distributor 1 above the output collector 2 so that the LNB power connection A is facing the control panel 1 A 2 Fasten the outer sockets of the SAT IF input distributor 3 with two nuts and lock washers put under each 3 3 Tighten the nuts until the teeth on the lock washers have penetrated the exte rior coati...

Page 7: ...nals 4 in the rear wall of the head end station using a HF cable made on site length approx 30 cm Connect the loop through output C to input B using a HF cable made on site length approx 30 cm 4 D C B Using two reception areas Connect inputs B and D of the SAT IF input distributor to the appropriate pre installed F terminals 4 in the rear wall of the head end station using HF cables made on site l...

Page 8: ... 8 SID 162 5 2 Connecting the power supply Connect plug 6 of the cable of the LNB power connection A to one of the contacts LNB power supply 800 mA total LNB power supply 6 A ...

Page 9: ...curely tighten the cable connections F connector using an open ended spanner spanner gap 11 mm Programme the modules connected and the head end station if necessary Position the breakthroughs in the base plate above the fastening screws 2 Push the base plate in direction of the arrow and lock it with the locking screw 1 Tighten the fastening screws 2 1 2 2 2 Tighten the nuts of retrofitted F termi...

Page 10: ...euthener Straße 43 D 90471 Nuremberg Phone 49 0 911 703 8877 Fax 49 0 911 703 9210 www gss de en info gss de Service Phone 49 0 911 703 2221 Fax 49 0 911 703 2326 service gss de Alterations reserved Technical data E O E by GSS Grundig Systems GmbH 002 2017 ...

Reviews: