![Grundig GSS SID 162 A Assembly Instruction Manual Download Page 10](http://html.mh-extra.com/html/grundig/gss-sid-162-a/gss-sid-162-a_assembly-instruction-manual_2272535010.webp)
- 10 -
SID 162 A
6
f
inal
proCedures
After installing the head-end station, retrofitting accessories or installing mod-
ules it is necessary to tighten all cable connections, F terminals and cover
screws in order to maintain compliance with current EMC regulations and to
ensure a reliable operation.
•
Securely tighten the cable connections (F connector) using an open-ended
spanner (spanner gap 11 mm).
• Mount the front cover and - if there is one - the base plate (see assembly
instructions of the head-end station).