English (GB)
13
4. Installation
4.1 Transport and storage
• Handle with care, do not throw!
• Dry and cool storage place.
4.2 Unpacking
• Observe when unpacking:
– No humidity should get into gas-leading parts!
– No foreign matter should get into gas-leading parts!
– Remove plugs not until the connections shall be made!
• Mount as soon as possible after unpacking.
4.3 Mounting
4.3.1 Requirements for mounting
• Installations at the pressure side from the containers resp. the
evaporator are present and checked for tightness
• Piping has been rinsed with nitrogen
– no more soiling present
• Filter and liquid gas trap and pressure reducing valve has
been installed directly before the vacuum regulator
• Directly before the vacuum regulator the highest temperature
in the course of the pressure gas lines is present.
– If necessary, wrap a heater band around the pressure line
connection of the vacuum regulator.
4.3.2 Pressure line connection
Required tools and accessories
• 2 fork wrenches 19 mm
With connection set
• Put it flat gasket.
• Screw the pressure line into the connection piece
– tighten with hemp or weld the threat
Fig. 15
Pressure line with connection set
4.3.3 Without connection set
• Put in flat gasket.
• Screw the pressure line connection (flange) to the flange of
the pressure line resp. the flange of the component before.
Fig. 16
Pressure line without connection set
Warning
Observe the information, see chapter
Warning
Ensure that all container valves are closed before
mounting.
Only use the intended line types!
Caution
Do not install the vacuum regulator on walls, plates
or something similar. Danger of distortion! The
device will only be carried by the connection with the
pressure line.
Ensure that all piping is free of distortion.
Do not mount the device in a distorted manner.
Note
Ensure that the pressure lines are as short as
possible.
TM
04 086
4
TM0
4
086
5