background image

7

English (US)

4. Starting up the product

4.1 LED diagnostics

Fig. 4

The indicator lights located on the control plate

4.2 DIP switch settings

TM

06

 55

87

 50

15

UPZCV-6  6 Valve Zone Rela

y

Part Number: 

98863570

Input: 

120VAC 50/60Hz 20A MAX

CAUTION, 

RISK OF ELECTRICAL SHOCK -

DISCONNECT POWER PRIOR TO SERVICING

ATTENTION, 

RISQUE DE CHOC ÉLÉCTRIQUE -

DÉCONNECTEZ LA PUISSANCE AVANT D’ENTRETENIR

ZONE 1

ZONE 2

ZONE 3

ZONE 4

ZONE 5

ZONE 6

Certified to CSA C22.2 No 24

Conforms to UL Standard 873

Listed

The power indicator light "Grundfos" is 
lit when you power on the unit.

The LED lights will be green

when there is a call for heat.

The LED lights will turn

amber when the zone valve

end-switch is closed.

Caution

CAUTION

Disconnect the power supply before 
changing any DIP switch settings.

Master/Slave
Allows expansion to additional Grundfos UPZC 
units.

Priority ON
Zone 1 operates as priority and the other 
zones are switched off for a selectable 30 or 
60-minute timeout.

Pump Exercise ON
Pumps will operate for 30 seconds every 72 
hours or every 14 days.

Boiler ON/Secondary ON
You can control the BOILER PUMP and 
SECONDARY PUMP to ON/OFF during 
PRIORITY demand.

OFF

OFF
OFF

OFF

Master

Pump Exercise ON

Priority 30 min.

Slave

Priority ON

Exercise 30 sec./72 hrs.

During priority demand

Secondary Pump ON

Boiler Pump ON

60 minutes

30 sec./14 days

Summary of Contents for UPZCV-3

Page 1: ...GRUNDFOS INSTRUCTIONS UPZCV 3 4 6 Multi zone valve control Installation and operating instructions ...

Page 2: ...rdance with GRUNDFOS printed installation and operating instructions To obtain service under this warranty the defective product must be returned to the distributor or dealer of GRUNDFOS products from which it was purchased together with proof of purchase and installation date failure date and supporting installation data Unless otherwise provided the distributor or dealer will contact GRUNDFOS or...

Page 3: ...ves you specific legal rights and you may also have other rights which vary from jurisdiction to jurisdiction 1 3 Symbols used in this document 2 Receiving the product 2 1 Inspecting the product Examine the components carefully to make sure no damage has occurred to the pump during shipment 3 Installing the product 3 1 Mechanical installation 3 1 1 Installing the base Attach the base firmly to the...

Page 4: ...Use approved UL conduit fittings You can find additional wiring schematics specs and troubleshooting help online at www grundfos us controls Caution CAUTION Class 2 wiring must be segregated from the wiring of Class 1 circuits When Class 2 wiring is routed with Class 1 wiring the Class 2 wiring insulation must be rated for the minimum voltage of the Class 1 wiring Segregation is not required if al...

Page 5: ... PRIMARY PUMP is ON or OFF TM06 5338 5115 L N L N L N L N C B A X X X X R W C R W C R W C R W C R W C R W C 4 3 2 1 4 3 2 1 4 3 2 1 4 3 2 1 4 3 2 1 4 3 2 1 L N OFF OFF OFF OFF Master SW1 Pump Exercise ON Priority 30 min Slave Priority ON Exercise 30 sec 72 hrs During priority demand Secondary Pump ON Boiler Pump ON 60 minutes 30 sec 14 days Dip switches 3 1 2 R Rh W C Jumper Mod con boiler Jumper ...

Page 6: ... MASTER board to activate any boiler or secondary pumps and close the contacts XX MAIN You can connect the pump and valve boards When the SLAVE board calls for heat the secondary pump will be powered If a boiler pump and secondary pump are to be used connect them to the same terminals You can use the low voltage wire to connect the ABC terminals Connect the 120 VAC power supply to each board TM06 ...

Page 7: ...LED lights will be green when there is a call for heat The LED lights will turn amber when the zone valve end switch is closed Caution CAUTION Disconnect the power supply before changing any DIP switch settings Master Slave Allows expansion to additional Grundfos UPZC units Priority ON Zone 1 operates as priority and the other zones are switched off for a selectable 30 or 60 minute timeout Pump Ex...

Page 8: ... MAIN XX are wired to the boiler When the contacts close the boiler starts and will come up to a preset temperature for hydronic heating DHW terminal The two terminals labeled PRIORITY XX are wired to the boiler When the contacts close the boiler starts and will come up to a preset temperature for domestic hot water heating Front facing LED indicator lights on the cover Side mounted terminal conne...

Page 9: ...98996473 Three zone valve Four zone valve Six zone valve Model number UPZCV 3 UPZCV 4 UPZCV 6 Part number 98863567 98863568 98863570 Input power 60 Hz 120 VAC Transformer voltage 24 VAC 40 VA Class 2 24 VAC 40 VA Class 2 24 VAC 80 VA 40 VA x 2 Class 2 Thermostat output A 0 375 0 5 0 75 Maximum single phase motor rating per zone A 5 Maximum combined load rating output 120 VAC A 20 Temperature range...

Page 10: ...10 ...

Page 11: ...3 227 3500 www grundfos us Grundfos Canada 2941 Brighton Road Oakville Ontario L6H 6C9 Canada Phone 1 905 829 9533 Fax 1 905 829 9512 www grundfos ca Grundfos México Boulevard TLC No 15 Parque Industrial Stiva Aeropuerto C P 66600 Apodaca N L Mexico Phone 011 52 81 8144 4000 Fax 011 52 81 8144 4010 www grundfos mx ...

Page 12: ...73390 www grundfos com The name Grundfos the Grundfos logo and be think innovate are registered trademarks owned by Grundfos Holding A S or Grundfos A S Denmark All rights reserved worldwide Copyright Grundfos Holding A S ...

Reviews: