4.2 Installation notes

4.2.1 Location

The Selcoperm system should be installed in a frost-free room 
with good natural ventilation. Make sure that the 
electrochlorinator is positioned with a 750 mm clearance on both 
the hydraulic and cell sides to ensure easy access for 
maintenance and servicing. Also ensure that sufficient clearance 
is given for access to the control panel and for control panel door 
to open, as shown in fig. 

7

.

4.2.2 Vent piping - very important

Make sure that internal vent hose and external ventilation 
pipework is installed to a safe discharge point at the exterior of 
the building.

Radius of zone 2 at discharge point:

The pipework should be installed as direct and straight as 
possible with no dips and no more than 10 m in length. For longer 
distances please ask Grundfos for suitable solutions. The run 
should rise continuously in an uphill direction towards the safe 
discharge point. The end of ventilation pipework should be fitted 
with a tee to ensure the free flow of hydrogen while protecting the 
ventilation line from ingress of rain (fig. 

23

). Vent outlets can be 

fitted with low-restriction cowls to prevent against blockages such 
as nesting birds.
Inner ventilation tube should pass through the Venturi tee and 
end at the point where the ventilation pipe leaves the building 
(fig.

7

).

Make sure that the ventilation pipe run is at least 700 mm higher 
than the highest point in the product line to product tank (fig. 

7

).

Make sure that the Venturi tee is positioned within the vent line in 
the correct orientation (arrow shows flow direction) and with the 
connection to the product line in a vertical, pointing down 
orientation (fig. 

20

).

Figure 

10

 shows a detailed diagram illustrating the Venturi tee 

and its correct installation.

4.2.3 Connective pipework

Make sure that all pipes and fittings of your installation are 
suitable for drinking water. All electrolyser connections are made 
of PVC-U as a standard. All pipework should be made of PVC-U. 
We recommend to use black PE pipes and fittings for the outdoor 
vent piping, because of their higher resistance to UV radiation.
Use glued connections or flanges for the PVC pipework. For 
correct sealing of glued connections, prepare the surfaces with a 
proprietary solvent cleaner and use a proprietary PVC glue.
Use flanges to connect the PVC pipework to the PE pipework.
Make sure that the product line from the electrolyser to the 
product tank is installed horizontally or downwards. See fig. 

8

.

The table below shows the connection sizes for the standard 
Selcoperm product range. Position of connections, see fig. 

2

.

Prior to installation, all

 

pipework and fittings between components 

should be checked to ensure they conform to appropriate local 
and international legislation.

4.2.4 Water supply

Good quality filtered water is required according to specification 
in section 

6.3.1 Water specification

. If there is insufficient 

pressure, a booster pump is required. Where the sodium 
hypochlorite produced is to be dosed into drinking water, it is 
preferable to use final treated mains water.
Flow rates see section 

3. Technical data

. The tables do not 

include the water demand for water softener regeneration.
Water supply connections must be checked to ensure they 
conform to respective international standards e.g. double 
non-return valves on input.

4.2.5 Water softener

Make sure that the waste outlet (fig. 

2

, pos. E) has been piped to 

an open, unpressurised drain point. The drain point for the 
system should not be situated higher than 2 m above the height 
of the softener waste outlet. As standard the electrochlorinator is 
fitted with a 32 mm (1") waste connection to provide an 
unpressurised return back to the drain.

4.2.6 Brine tank

Figure 

9

 shows a typical brine tank assembly.

The table below shows the connection sizes for the standard 
brine tank range.

When a bulk salt saturator (with more than 2 m in height) is 
installed, a break tank should be installed before the softener and 
electrochlorinator.

4.2.7 Level sensor

Make sure that the product tank level sensor (fig. 

3

, pos. 25) is 

correctly installed at the base of the product tank and all wiring 
connections back to the Selcoperm have been made and 
checked.

4.2.8 Ventilation

Make sure that room vents or louvers are installed at high and low 
level of the installation room to encourage natural ventilation 
throughout the electrochlorination area.

Selcoperm 125

0.5 m

Selcoperm 250
Selcoperm 500

0.8 m

Selcoperm 1000
Selcoperm 2000

1.0 m

Connection

Pipe bore 

[inch]

Pipe diameter 

[mm]

Hydrogen gas outlet (L)

3

90

Product outlet (K)

1

32

Water inlet (C)

1/2

20

Soft water outlet (B)

1/2

20

Brine inlet (D1, D2)

1/2

20

Waste outlet (E)

1

32

Note

Temperature drop between brine tank and 
electrochlorinator may result in crystallization of salt.

Connection

Pipe bore 

[inch]

Pipe diameter 

[mm]

Soft water inlet

1/2

20

Brine outlets

1/2

20

Summary of Contents for Selcoperm SES 125-2000

Page 1: ...elcoperm SES 125 2000 Electrochlorinator Valid for SES 125 250 500 1000 built from week 37 2015 Valid for SES 2000 built from week 20 2014 Installation and operating instructions GRUNDFOS INSTRUCTIONS...

Page 2: ...em via a display with control and display elements 1 General safety instructions 2 1 1 Purpose of this document 2 1 2 Symbols used in this document 2 1 3 Users target groups 2 1 4 Obligations of the o...

Page 3: ...guaranteed for a period of two calendar years from installation and commissioning provided optimum operating conditions are as detailed in this manual The maximum period for full guarantee is 36 month...

Page 4: ...al It is the duty of the operator to ensure that he has obtained information on all safety precautions relevant to the type of task he is undertaking and to ensure that they are adhered to Grundfos re...

Page 5: ...ood switch F Soft water sample valve 7 Non return valve 19 Air dilution fan G Electrolyte sample valve 8 Water flow adjustment valve 20 Flowmeter switch H Product sample valve 9 Degassing column level...

Page 6: ...ment valve 21 Floater valve G Electrolyte sample valve 9 Degassing column level sensor 22 Control panel H Product sample valve 10 Pressure reducing valve 23 Control lamp of mains supply I Product over...

Page 7: ...ank M When the product reaches the stop fill level 25b in the product tank M the process is stopped The process is restarted when the product level in the tank M falls below the start fill level The p...

Page 8: ...minal g h 125 110 250 220 500 450 1000 900 2000 1800 Connection I imperial M metric Supply voltage frequency H 110 120 V 50 60 Hz G 220 240 V 50 60 Hz K 380 415 V 50 60 Hz Software language GB English...

Page 9: ...2 Dimensional drawing Fig 5 Dimensional drawing Type 125 250 500 1000 2000 Gross weight kg 299 309 319 334 349 Net weight kg 160 170 180 195 210 TM04 1594 3011 712 457 104 300 1570 1112 215 170 245 3...

Page 10: ...to 40 Permissible mains water operating temperature C 10 to 20 Transport and storage temperature drained and not connected C 5 to 50 Max altitude above sea level m 2000 System frame PP Chamber covers...

Page 11: ...k and collecting tray X30 7 X30 7 GND BN 24 VDC WH Signal GN Tray flood switch of product tank Product tank level sensor Single phase Three phase Mains power supply To customer telemetry Mains power s...

Page 12: ...ray No liquid in collecting tray Remote stop signal System stopped System running Emergency stop signal System stopped System running Data 125 125 250 500 1000 2000 single phase single phase three pha...

Page 13: ...ng Horizontal ventilation pipework has to be installed with a constant upwards incline towards a safe discharge point min 2000 min 700 min 150 1 Duty standby dosing pumps 5 Pressure level sensor 2 Pro...

Page 14: ...017 3 3 3 1 1 2 1 Soft water inlet 20 mm 2 Minimum gravel level 3 Brine outlets 20 mm Note Requirements and capacities of brine tank see section 3 6 Brine tank capacities TM04 1504 3011 6 5 4 3 2 2 1...

Page 15: ...VC pipework to the PE pipework Make sure that the product line from the electrolyser to the product tank is installed horizontally or downwards See fig 8 The table below shows the connection sizes for...

Page 16: ...lues Press ESC to exit the edit mode Once all values are set press ESC to exit service menu 1 and return to main display screen in main menu Warning Before making any electrical connections switch off...

Page 17: ...SC ESC ESC GRUNDFOS INFORMATION WWW GRUNDFOS COM ENTER PASSWORD 01987 1 AIR FLOW X m hr GENERATING TIME X hrs SERVICE MENU 1 X AMPS X VOLTS VOLTAGE ALARM ALARM TIMER X sec AIR FLOW m hr TANK HEIGHT X...

Page 18: ...d turn the screw clockwise until pin 2 is positioned in regeneration start range 4 for regenerating the right side of the softener During regeneration pin 2 moves clockwise Wait until pin 2 has left t...

Page 19: ...th isolating valve 16a For further advice please contact Grundfos 6 5 Checks during operation 6 5 1 Checking the water hardness A properly functioning water softener 4 is crucial for the efficiency an...

Page 20: ...ing time The alarm timer must be reset after completion of testing After the triggering of each alarm the electrochlorinator will need to be reset at control 28 6 8 1 Internal tray flood alarm The int...

Page 21: ...Safety installations which have been disabled during maintenance must be enabled again immediately after maintenance Warning Danger of personal injury from chlorine gas Sodium hypochlorite solution te...

Page 22: ...leaning If necessary clean all system surfaces with a moist and clean cloth 7 8 Acid cleaning 1 Switch off power supply at switch 29 and isolate system from the mains voltage 2 Connect hose to product...

Page 23: ...erature of electrolyser cell 1 to high CELL TEMP Mains water temperature to high Check and rectify High ambient temperature Ambient temperature must not exceed 40 C Faulty temperature sensor Replace t...

Page 24: ...or 98056760 Electrolyser cell SES 2000 14 98058479 Brine valve water softener 3 97721401 Brine pump SES 125 250 500 15 98058478 Brine injection valve 97722252 Brine pump SES 1000 2000 17 98056894 Inte...

Page 25: ...ller language Russian 2 95727184 Temperature sensor 3 98710813 Electrolyser power supply SES 125 98710815 Electrolyser power supply SES 250 98710816 Electrolyser power supply SES 500 98710817 Electrol...

Page 26: ...until spring 2009 TM04 1506 3311 Pos Product No Description 1 98056828 Side entry valve 2 95727187 3 4 lateral filter TM04 1595 3311 Pos Product No Description 1 98056894 Tray flood switch 2 95721859...

Page 27: ...Grundfos company or service workshop 11 Photos Fig 20 Correct installation of Venturi tee Fig 21 Typical installation Warning Before dismantling the system must be completely flushed with water in or...

Page 28: ...English GB 28 Fig 22 Installation pipework Fig 23 Safe ventilation point Subject to alterations TM04 1514 1210 TM04 1515 1210...

Page 29: ...niejsza dotyczy jest zgodny z nast puj cymi dyrektywami Rady w sprawie zbli enia przepis w prawnych pa stw cz onkowskich PT Declara o de conformidade UE A Grundfos declara sob sua nica responsabilidad...

Page 30: ...Declaration of conformity EAC 30 Declaration of conformity EAC 2 Selcoperm SES SEP 004 2011 010 2011 020 2011 TC RU C DK 30 01060 05 11 2019 153032 1 1 2016 143581 188...

Page 31: ...an GRUNDFOS Pumps K K 1 2 3 Shin Miyakoda Kita ku Hamamatsu 431 2103 Japan Phone 81 53 428 4760 Telefax 81 53 428 5005 Korea GRUNDFOS Pumps Korea Ltd 6th Floor Aju Building 679 5 Yeoksam dong Kangnam...

Page 32: ...3971 The name Grundfos the Grundfos logo and be think innovate are registered trademarks owned by Grundfos Holding A S or Grundfos A S Denmark All rights reserved worldwide Copyright Grundfos Holding...

Reviews: