Maintenance
English
Plate Heat Exchanger
13
EN
EN
Finally the middle pair of bolts, and upper
and lower bolts are tightened.
If the plates are correctly assembled, the
edges form a “honeycomb” pattern, see
picture below.
Pressure test after maintenance
Before start-up of production, whenever plates or
gaskets have been removed, inserted or exchanged,
it is strongly recommended to perform a pressure
test to confirm the internal and external sealing func-
tion of the PHE. At this test, one media side at the
time must be tested with the other side open to the
atmosphere.
The pressure testing shall be performed at a pres-
sure equal to the operating pressure of the actual unit
but never above the design pressure as stated on the
nameplate.
The recommended test time is 10 minutes.
Please note that PHE units for refrigeration applica-
tions and units with media not mixable with water
must be dried after hydrostatic pressure testing.
Please consult the local office/representative of the
supplier for advice on the pressure testing proce-
dure.
Note!
The actual measurement must never be less
than the A-dimension.
6
Summary of Contents for MAGNA3 Series
Page 3: ......
Page 6: ...GRUNDFOS INSTRUCTIONS MAGNA3 Installation and operating instructions ...
Page 102: ...34 of 36 2009 D 664 07 09 Notes ...
Page 103: ...35 of 36 2009 D 664 07 09 Notes ...
Page 121: ......
Page 122: ......
Page 132: ......
Page 133: ......
Page 134: ...Coordinate power and control requirements with respective trades ...
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 140: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......