English (GB)
14
12.2 Manual operation
The pump set can also be manually started and stopped for a
functional test, at start-up or after service work.
Starting procedure
Stopping procedure
Note
It is assumed that the pump has already been
vented and commissioned.
Step
Illustration
1. Set the main switch to
"I" if this has not
already been done.
2. Set the selector switch
to "Test" by means of
the key.
3. Open the isolating valve of the test pipe.
4. Start the pump
manually by pressing
[Start]. Press the
button until the pump
starts.
Note:
If the pump does not start, see the indicator lights.
See also section
.
Step
Illustration
1. Stop the pump
manually by pressing
[Stop].
2. Set the selector switch
to "Auto" by means of
the key.
3. Close the isolating valve of the test pipe.
Note
After stopping, the pump set returns to automatic
mode.
Summary of Contents for EPC 300
Page 1: ...GRUNDFOS INSTRUCTIONS Fire Control EN electric 55 kW Installation and operating instructions...
Page 2: ...2...
Page 23: ...BG 23 8 4 8 1 TM05 0744 1511 Test Test 1 2...
Page 24: ...BG 24 8 2 Status 8 3 Alarms AR1 AR2 AR3 1 2 P1 P1 AR1 AR4 DI4 AR5...
Page 26: ...BG 26 11 10 1 I 2 Test 3 4 Start 8 3 15 5 6 25 Nm 1 2 30 Nm 3 8 7 Stop 8 Auto 9...
Page 27: ...BG 27 12 8 2 15 12 1 Auto I Auto Test Stop O I 1 2...
Page 28: ...BG 28 12 2 1 I 2 Test 3 4 Start 15 1 Stop 2 Auto 3...
Page 29: ...BG 29 12 3 1 Test 2 3 P1 4 Stop 5 P2 6 12 2...
Page 30: ...BG 30 13 14 5 Grundfos 5 12 2 1 2 3 4 EN TM05 4262 2112...
Page 32: ...BG 32 16 Grundfos Grundfos 17 18 1 2 Grundfos Grundfos Grundfos...