15
4. Installation
4.1 Transport and storage
•
Handle with care, do not throw!
•
Dry and cool storage place.
4.2 Unpacking
•
Observe when unpacking:
– No humidity should get into gas-leading parts!
– No foreign matter should get into gas-leading parts!
•
Check the scope of delivery.
•
Mount as soon as possible after unpacking.
4.3 Typical installation
Fig. 14
Typical installation
4.4 Mounting
•
The cylinder must be properly placed and fixed.
•
All connections must be absolutely clean and dry.
•
Remove the protective cap from the cylinder.
•
Insert the gasket at the pressure connection of the device.
•
Do not remove the filter at the pressure connection of the
device!
•
Screw the device onto the connection of the cylinder
4.5 Checking the tightness after changing the cylinder
See chapter
5. Commissioning
5.1 Preparations for commissioning
5.1.1 Vacuum connections
Fig. 15
Vacuum connections
T
M
04
07
07
09
08
Item
Description
1
Gas cylinder
2
Compact Dosing vaccuperm VGB-103
3
Adsorption device
4
Injector
5
Gas warning device
6
Gas sensor
1
2
3
4
5
6
~10cm
Warning
Observe the information, see chapter 2. Handling
chlorine
Warning
Never re-use used gaskets!
Replace the gaskets at any change of gas
container!
Never use the device without the filter!
Caution
Do not align the device by turning the housing!
If necessary, hold up with a fork wrench size 13!
Warning
The system may only be commisioned by
authorised service personel from Grundfos
Alldos
Warning
Before connecting, ensure that the valves of all
gas containers are closed.
Only use the intended line types!
TM0
4
070
8 090
8
1
2
VGB-103