background image

 

Technical specifications 

 

 

 

29 | 32 

BA_

TD

3-

G

H

000en

_015_A

uf

ber

ei

tu

ngs

gr

uppe

.doc

EU Declaration of Conformity 

In accordance with the EU RoHS Directive 2011/65/EU, Appendix VI 

 

This is to certify that the system designated below meets the safety and health 

requirements of the applicable European guidelines in terms of its design, construction and 

execution. 

The system meets the requirements of EU Directive 2011/65/EU of the European 

Parliament and of the Council of June 8, 2011 on the restriction of the use of certain 

hazardous substances in electrical and electronic equipment. 

This certificate becomes void if the system is modified in any way not approved by us. 

Treatment group | thermaliQ:HB2 

Serial no.: Refer to type plate  

 
 
 
 

Responsible for documentation: 

Dipl.-Ing. (FH) Markus Poepperl 

Manufacturer 

Grünbeck Wasseraufbereitung GmbH 

Josef-Grünbeck-Str. 1 

89420 Hoechstaedt/Germany 

Hoechstaedt, October 17, 2018 

 

 

 

Dipl. Ing. (FH) Markus Poepperl 

Head of Technical Product Design 

 

Summary of Contents for thermaliQ:HB2

Page 1: ...We understand water Treatment group thermaliQ HB2 Operation manual...

Page 2: ...itten consent of Gr nbeck Wasseraufbereitung GmbH no part of this manual may be reproduced in any way nor may any part be processed duplicated or distributed using electronic systems Non compliance wi...

Page 3: ...11 3 3 Accessories 12 3 4 Functional description 12 4 Installation 14 4 1 Requirements in relation to the installation site 14 4 2 Checking the scope of supply 15 4 3 Installing the product 16 5 Star...

Page 4: ...ing documents shall be deemed as applicable documents for the treatment group thermaliQ HB2 The manuals of all accessories used 1 2 Target group This manual is intended for specialist installers and o...

Page 5: ...u must comply with in order to avoid damage to property This symbol identifies important information about the product or its handling This symbol identifies work that may only be carried out by speci...

Page 6: ...steps does not matter Action Instruction Multi step instruction and chronological sequence of steps is important 1 First action a first step b second step 2 Second action Result following an instruct...

Page 7: ...s or orders Enter the necessary information in the table below to have it readily available when necessary Item Designation Item Designation 1 Observe operation manual 2 Max operating pressure 3 Ambie...

Page 8: ...be void Only have persons working on your product that have read and understood the present manual and that are qualified to do such work due to their vocational training Only operate the product if...

Page 9: ...s may occur NOTE without warning triangle means that property damage may occur 2 3 Regulations When installing and starting up the system amongst others comply with the following regulations and guide...

Page 10: ...er Comply with the following instructions to ensure the proper and safe functioning of the product Arrange for a specialist installer to carry out installation start up and maintenance Have the produc...

Page 11: ...e full demineralisation of raw water for the initial filling or make up water feed of heating systems The treatment group thermaliQ HB2 may only be installed in horizontal pipes 3 2 Product components...

Page 12: ...demineralisation of water for heating systems desaliQ connection adapter 707 276 Adapter to connect the filling cartridge desaliQ HB4 to the treatment group thermaliQ HB2 desaliQ hose kit 126 400 2 dr...

Page 13: ...pletely mixed state The cation exchanger resin removes all positively charged ions the so called cations from the raw water All cations contained in the water such as calcium magnesium sodium are exch...

Page 14: ...inking water filter pureliQ 2 Filling group thermaliQ SB13 4 1 Requirements in relation to the installation site Observe local installation directives general guidelines and technical specifications T...

Page 15: ...reliQ K refer to chapter 4 item 1 must be installed upstream of the product A system separator e g filling group thermaliQ SB13 must be installed upstream of the product as per DIN EN 1717 refer to ch...

Page 16: ...he water meter screw connection at the outlet side of the treatment group 3 Install the treatment group in between without any mechanical stress On the inlet side use the flat gasket and on the outlet...

Page 17: ...Starting up the product 5 1 1 Deaerate the product 1 Open both vent valves 2 Open the shut off valve As soon as no air escapes any longer 3 Close the vent valve on the inlet side 4 Close the vent val...

Page 18: ...ng cell 1 Open the shut off valve 2 Visually check for leaks 3 Press the button of the conductivity measuring cell The LED of the conductivity measuring cell is flashing the conductivity measuring cel...

Page 19: ...r When handing over the product proceed as follows 1 Inform the owner user how the water treatment group works 2 Hand over all documents to the owner user for keeping 3 Use the manual to brief the own...

Page 20: ...uring cell The measuring cell is activated After the activation an LED is flashing The conductivity measuring cell switches off after a period of 45 minutes Display of the conductivity measuring cell...

Page 21: ...roceed as follows 1 Close the valve on the inlet side 2 Open the vent valves The treatment group is depressurised 3 Dismantle the plastic cylinder turn left 4 Replace the exhausted cartridge by a new...

Page 22: ...onductivity measuring cell 1 Remove the lid of the conductivity measuring cell 2 Remove the circuit board 3 Remove the used battery 4 Insert a new battery 5 Close the lid of the conductivity measuring...

Page 23: ...t once a year Proper operation and maintenance of the product are essential for trouble free and hygienic operation A maintenance contract ensures that all the required maintenance work will be perfor...

Page 24: ...ck for leaks 2 Check the function of the conductivity measuring cell refer to chapter 6 1 7 3 Maintenance In order to carry out maintenance proceed as follows 1 Visually check for leaks 2 Check the fu...

Page 25: ...sumables Product Order no Filling cartridge desaliQ HB2 707 745 Battery CR2032 WZ9 790075e 7 5 Spare parts You may order spare parts and consumables from your local Gr nbeck representative refer to th...

Page 26: ...of conductivity measuring cell does not flash The battery is exhausted Replace the battery refer to 6 3 The conductivity measuring cell is defective Replace the conductivity measuring cell LED of con...

Page 27: ...this product or the electrical and electronic components must not be disposed with household waste Dispose of electrical and electronic products and components in an environmentally sound manner For...

Page 28: ...n mm 55 D Height below centre of pipe connection with cylinder mm 380 E Clearance required to replace the filling cartridge mm 100 F Min distance to wall mm 70 G Total height mm 435 Operating weight k...

Page 29: ...nts of EU Directive 2011 65 EU of the European Parliament and of the Council of June 8 2011 on the restriction of the use of certain hazardous substances in electrical and electronic equipment This ce...

Page 30: ...ivity measuring cell 12 19 23 25 27 D Disposal 28 I Inspection 24 25 Installation 10 11 15 M Maintenance 9 11 24 25 P Product components 12 S Spare parts 9 26 Start up 10 11 18 T Technical specificati...

Page 31: ......

Page 32: ...Gr nbeck Wasseraufbereitung GmbH Josef Gr nbeck Str 1 89420 Hoechstaedt GERMANY For more information go to www gruenbeck com 49 9074 41 0 49 9074 41 100 info gruenbeck com www gruenbeck com...

Reviews: