Reverse osmosis system
GENO-OSMO RO 125K
Order no.
285 752 940-inter Edited by: phar-mrie G:\BA-752940-INTER_285_RO_125K.DOCX
45
H
Maintenance and care
1 | Basic information
In order to guarantee the reliable function of the systems over a long
period of time, some maintenance work has to be performed at
regular intervals. All regulations and guidelines which apply at the
installation site must be strictly adhered to.
Check the quality and the system volume flows every day.
Maintenance has to be performed by Grünbeck’s technical
customer service/authorised service company or by a specialised
company. Maintenance is subject to the load, but at the latest has
to be performed once a year.
An operation log and the corresponding test log must be kept in
order to document the maintenance work performed.
Note:
By concluding a maintenance contract you ensure that all
maintenance work will be performed in due time.
The maintenance work performed must be documented in the
checklist, refer to appendix "Operation log"
2 | Inspection (functional check)
You may perform the daily inspections yourself.
Please refer to the following summary for the tasks to be performed
within the framework of an inspection.
Overview: Inspection work
Determine the feed water hardness (inlet).
(Water test kit "Total hardness")
Determine the permeate quality. Either at the display if a
conductivity monitoring device is installed or by means of a
manual conductivity meter.
Read the recovery.
Take the remaining time of the service interval into consideration
Chapter F point 2.2 Read operating state.
In case the remaining time of the maintenance interval is < 30 days,
inform Grünbeck's technical customer service about the impending
service.